Tampa Bay Florida Department of Transportation
US 92 (Hillsborough Avenue) Resurfacing from North Park Place to east of North Central Avenue 450336-1-52-01
Project Details
Work TypeResurfacing
PhaseDesign
LimitsUS 92/SR 600/Hillsborough Avenue from north Park Place to east of North Central Avenue
Length1.1 miles
CityTampa
CountyHillsborough
RoadHillsborough Avenue SR 600 US 92
Contact Information
Design Manager
Michael MacKinnon
813-975-6431
Michael.MacKinnon@dot.state.fl.u
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us
About
The purpose of this project is to preserve and extend the life of the existing pavement through resurfacing along this section of US 92 in Hillsborough County.
In addition to resurfacing, the project also includes sidewalk ADA upgrades.
Construction is currently anticipated to begin Winter 2026.