===== PAGE 1 =====
## I-75 at SR 52 Interchange Improvements 454668-1-52-01
| Project Details |
| Work Type | Interchange Improvement |
| Phase | Completed |
| Limits | I-75 and SR 52 interchange area |
| Project Start | April 26, 2026 |
| City | San Antonio |
| County | Pasco |
| Road | I-75 SR 52 |
| Construction Cost | $2.1 million |
| Estimated Completion | October 17, 2026 |
| Contractor | C.W. Roberts Contracting, Incorporated |
Contact Information
Project Information
John McShaffrey
813-975-6930
john.mcshaffrey@dot.state.fl.us
Media Contact
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us
Map data ©2026 Google
## About
As of October 17, 2026, all construction activities associated with this project have been completed.
Interchange improvements that were constructed with this project included the following:
- Re-striped the existing pavement to provide a 2-lane northbound I-75 exit ramp to SR 52.
• Provided a 2-lane ramp from westbound SR 52 to the southbound I-75 entrance ramp.
• Provided dual left turn lanes from eastbound SR 52 to the entrance ramp onto northbound I-75.
• Provided two receiving lanes on the northbound I-75 entrance ramp.
• Reconfigured the existing lanes on westbound SR 52 from Pasco Road to I-75 accordingly.