US 41 Widening from SR 44 to Withlacoochee Trail bridge 257165-3-52-01
| Project Details |
| Work Type | Widening |
|---|
| Phase | Completed |
|---|
| Limits | from SR 44 to south of the Withlacoochee State Trail |
|---|
| Project Start | October 2, 2023 |
|---|
| Length | 1 mile |
|---|
| City | Inverness |
|---|
| County | Citrus |
|---|
| Road | US 41 |
|---|
| Construction Cost | $21.6 Million |
|---|
| Estimated Completion | Summer 2025 |
|---|
| Contractor | Watson Civil Construction, Inc. |
|---|
As of August 13, 2025, all construction activities associated with this project have been completed.
Contact Information
Project Information
John McShaffrey 813-975-6930
john.mcshaffrey@dot.state.fl.us
Media Contact
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us
This project widened US 41 from SR 44 (W Main Street) to south of the bridge over the Withlacoochee State Trail from a two-lane roadway to a four-lane divided road with bike lanes and sidewalks. New traffic signals were installed at a realigned intersection of US 41 / Montgomery Avenue /Zephyr Street and at the US 41 intersection at the Inverness Regional shopping center. Signal upgrades were made at the US 41 / SR 44 intersection.
The improvements on this project included:
Added one lane in each direction.
Added a median separation.
Added street lighting to all signalized intersections.
Provided bicycle lanes adjacent to travel lane in each direction.
Provided sidewalks on both sides.
Pedestrian safety upgrades at intersections.
Added a dedicated left turn lane for the southbound traffic going to Inverness Middle School.