===== PAGE 1 ===== #### US 19 (Suncoast Boulevard) Widening from W. Green Acres Street to S. Jump Court 405822-2-52-01
| Project Details | |
| Work Type | Widening |
| Phase | Completed |
| Limits | from W. Green Acres Street to S. Jump Court |
| Project Start | November 7, 2016 |
| Length | 2.1 miles |
| City | Homosassa Homosassa Springs |
| County | Citrus |
| Road | Suncoast Boulevard US 19 US 98 |
| Construction Cost | 32.7 million < /td > < /tr > < tr > < td style = 'text-align: center; word-wrap: break-word;' > Estimated Completion < /td > < td style = 'text-align: center; word-wrap: break-word;' > Summer 2023 < /td > < /tr > < tr > < td style = 'text-align: center; word-wrap: break-word;' > Contractor < /td > < td style = 'text-align: center; word-wrap: break-word;' > Nelson Construction < /td > < /tr > < /table > < table border = 1 style = 'margin: auto; word-wrap: break-word;' > < tr > < td colspan = "2" > Contact Information < /td > < /tr > < tr > < td colspan = "2" > Project Information < /td > < /tr > < tr > < td colspan = "2" > John McShaffreyn813-975-6930nroadwork@dot.state.fl.us < /td > < /tr > < tr > < td colspan = "2" > Media Contact < /td > < /tr > < tr > < td colspan = "2" > Kayla Mejian813-975-6060nKayla.Mejia@dot.state.fl.us < /td > < /tr > < /table > < div style = "text-align: center;" > < img src = "imgs/imginimagebox93053924321138.jpg" alt = "Image" width = "58%" / > < /div > ## About As of June 30, 2023, all work was completed and this project was final-accepted from the contractor. This project widened US 19 in Homosassa Springs from four lanes to asix-lane divided highway. The32.7 million project also constructed bike lanes, paved shoulders, a shared use path, and sidewalks from W. Green Acres Street to S. Jump Court. |