===== PAGE 1 ===== # SR 679 (Pinellas Bayway) repaving from Bunces Pass bridge to Madeira Circle 440244-1-52-01
Project Details
Work TypeRepaving
PhaseCompleted
Limitsfrom north of Bunces Pass bridge to north of Madeira Circle
Project StartOctober 12, 2022
Length2.7 miles
CitySt. Petersburg Tierra Verde
CountyPinellas
RoadPinellas Bayway SR 679
Construction Cost$5 million
Estimated CompletionFall 2023
ContractorHubbard Construction Company
Contact Information
Project Information
Maddie Pfingsten 727-575-8334 roadwork@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060 Kayla.Mejia@dot.state.fl.us
Image
Map data ©2023 Google, INEGI ## About As of September 11, 2023, all construction activities associated with this project have been completed. This project is repaving SR 679 (Pinellas Bayway) from north of Bunces Pass bridge to north of Madeira Circle in Tierra Verde. In addition to repaving the road, left turn lanes and separated bicycle lanes will be added. A signalized mid-block crossing on SR 679 at Sand Point Drive (13th Street SE) will be added along the corridor. Construction is underway and is expected to be complete in the fall of 2023.