===== PAGE 1 =====
# SR 679 (Pinellas Bayway) repaving from Bunces Pass bridge to Madeira Circle 440244-1-52-01
| Project Details |
| Work Type | Repaving |
| Phase | Completed |
| Limits | from north of Bunces Pass bridge to north of Madeira Circle |
| Project Start | October 12, 2022 |
| Length | 2.7 miles |
| City | St. Petersburg Tierra Verde |
| County | Pinellas |
| Road | Pinellas Bayway SR 679 |
| Construction Cost | $5 million |
| Estimated Completion | Fall 2023 |
| Contractor | Hubbard Construction Company |
| Contact Information |
| Project Information |
| Maddie Pfingsten 727-575-8334 roadwork@dot.state.fl.us |
| Media Contact |
| Kayla Mejia 813-975-6060 Kayla.Mejia@dot.state.fl.us |
Map data ©2023 Google, INEGI
## About
As of September 11, 2023, all construction activities associated with this project have been completed.
This project is repaving SR 679 (Pinellas Bayway) from north of Bunces Pass bridge to north of Madeira Circle in Tierra Verde. In addition to repaving the road, left turn lanes and separated bicycle lanes will be added. A signalized mid-block crossing on SR 679 at Sand Point Drive (13th Street SE) will be added along the corridor.
Construction is underway and is expected to be complete in the fall of 2023.