Tampa Bay Florida Department of Transportation
US 41 (Tamiami Trail) Repaving from 15th Ave to Bullfrog Creek 441387-1-52-01
Project Details
Work TypeRepaving
PhaseCompleted
Limitsfrom 15th Ave to Bullfrog Creek
Project StartNovember 25, 2021
Length8.5 miles
CityApollo Beach Ruskin
CountyHillsborough
RoadTamiami Trail US 41
Construction Cost$25.6 million
Estimated CompletionFall 2024
ContractorPreferred Materials, Inc.
About
All construction activities associated with this project were completed during February 2025.
The Florida Department of Transportation replaced the asphalt pavement with a durable concrete surface at US 41 (Tamiami Trail) and Big Bend Road (CR 672) in Hillsborough County.
In addition to the intersection improvements, this project repaved approximately 8.5 miles of roadway between 15th Avenue and Bullfrog Creek, added a sidewalk along the west side of US 41, and connected existing sidewalks on the east side of US 41 from bus stops to nearby intersections.