Tampa Bay Florida Department of Transportation
US 301 & SR 54 Sidewalk Improvements 450970-2-52-01
Project Details
Work TypeSidewalk Improvements
PhaseDesign
LimitsUS 301 (Gall Boulevard) from Medical Arts Court to Kossik Road; SR 54 from Sembler Drive to Touchpoint Drive
Length0.82 miles
CityOdessa Zephyrhills
CountyPasco
RoadGall Boulevard SR 39 SR 54 US 301
About
The purpose of this project is to construct a 6-ft concrete sidewalk on the east side of US 301 from Medical Arts Court to Kossik Road and on the north side of SR 54 from Sembler Drive to Touchpoint Drive in Pasco County.
Construction is anticipated to begin in late 2027.
Contact Information
Design Manager
Stephanie Wolchok
813-975-6244
Stephanie.Wolchok@dot.state.fl.us
Media Contact
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us