===== PAGE 1 ===== SR 682 (Pinellas Bayway) New Traffic Signal at Dolphin Cay Lane/Landings Drive in Pinellas County 254677-6-41
Project Details
Work TypeSafety Improvements
PhaseConstruction
Limitsat Dolphin Cay Lane/Landings Drive
Project StartJuly 13, 2026
CitySt. Petersburg
CountyPinellas
RoadSR 682
Construction Cost$1.6 million
Estimated CompletionSummer 2027
ContractorCone & Graham, Inc.
Contact Information
Project Information
Maddie Griffin727-575-8334
Maddie.Griffin@dot.state.fl.us
Media Contact
Kayla Mejia813-975-6060
Kayla.Mejia@dot.state.fl.us
Image
Map data ©2026 Google ## About The Florida Department of Transportation's Design-Build Firm, Cone & Graham, Inc., is adding a new traffic signal on SR 682 (Pinellas Bayway) at Dolphin Cay Lane/Landings Drive in Pinellas County. Other safety and operational improvements include road resurfacing, and pedestrian and lighting improvements. Construction activities are underway and expected to be complete in summer of 2027. ***** What is design-build? Design-build is a method of project delivery in which one entity - the design-build team - works under a single contract with the FDOT (or any owner) to fully design and construct a project. The contract work covers from initial design through construction completion. This contract type typically allows for faster construction of a project as design and construction can be on-going simultaneously.