===== PAGE 1 ===== ## SR 674 (Sun City Center Blvd) Repaving from Commercial Center Drive to US 301 436495-1-52-01
Project Details
Work TypeRepaving
PhaseCompleted
LimitsFrom Commercial Center Drive to US 301
Project StartNovember 2018
Length2.5 miles
CitySun City Center
CountyHillsborough
RoadSR 674 Sun City Center Boulevard
Construction Cost11.7 million < /td > < /tr > < tr > < td style = 'text-align: center; word-wrap: break-word;' > Estimated Completion < /td > < td style = 'text-align: center; word-wrap: break-word;' > Spring 2021 < /td > < /tr > < tr > < td style = 'text-align: center; word-wrap: break-word;' > Contractor < /td > < td style = 'text-align: center; word-wrap: break-word;' > Russell Engineering, Inc. < /td > < /tr > < /table > < table border = 1 style = 'margin: auto; word-wrap: break-word;' > < tr > < td colspan = "2" > Contact Information < /td > < /tr > < tr > < td colspan = "2" > Project Information < /td > < /tr > < tr > < td style = 'text-align: center; word-wrap: break-word;' > Shiva Moonian < /td > < td style = 'text-align: center; word-wrap: break-word;' > 813-612-3200 < /td > < /tr > < tr > < td colspan = "2" > Shiva.Moonian@dot.state.fl.us < /td > < /tr > < tr > < td colspan = "2" > Media Contact < /td > < /tr > < tr > < td style = 'text-align: center; word-wrap: break-word;' > Kayla Mejia < /td > < td style = 'text-align: center; word-wrap: break-word;' > 813-975-6060 < /td > < /tr > < tr > < td colspan = "2" > Kayla.Mejia@dot.state.fl.us < /td > < /tr > < /table > < div style = "text-align: center;" > < img src = "imgs/imginimagebox92853924311139.jpg" alt = "Image" width = "58%" / > < /div > ## About ## THIS PROJECT WAS COMPLETED ON JUNE 29, 2021 The Florida Department of Transportation'scontractor, Russell Engineering, Inc. is repaved SR 674 (Sun City Center Blvd) between Commercial Center Drive and US 301 in Sun City Center. Additional improvements included the addition and extension of turn lanes throughout the corridor and added afive-foot sidewalk along the north side of the roadway. This11.7 million project was expected to finish in spring of 2021.