| Project Details | |
| Work Type | Repaving |
|---|---|
| Phase | Completed |
| Limits | From Commercial Center Drive to US 301 |
| Project Start | November 2018 |
| Length | 2.5 miles |
| City | Sun City Center |
| County | Hillsborough |
| Road | SR 674 Sun City Center Boulevard |
| Construction Cost | $11.7 million |
| Estimated Completion | Spring 2021 |
| Contractor | Russell Engineering, Inc. |
The Florida Department of Transportation's contractor, Russell Engineering, Inc. is repaved SR 674 (Sun City Center Blvd) between Commercial Center Drive and US 301 in Sun City Center.
Additional improvements included the addition and extension of turn lanes throughout the corridor and added a five-foot sidewalk along the north side of the roadway.
This $11.7 million project was expected to finish in spring of 2021.