===== PAGE 1 =====
# US 301 Resurfacing from Balm Riverview Road to Lake Street Charles Boulevard 447972-1-52-01
| Project Details |
| Work Type | Resurfacing |
| Phase | Design |
| Limits | south of Balm
Riverview Road
to north of Lake
Street Charles
Boulevard |
| Length | 1.05 mile |
| City | Riverview |
| County | Hillsborough |
| Road | SR 43
US 301 |
| Contact Information |
| Design Manager |
| Digvijay Patil, P.E. |
| 813-975-6176 |
| Digvijay.Patil@dot.state.fl.us |
| Media Contact |
| Kayla Mejia | 813-975-6060 |
| Kayla.Mejia@dot.state.fl.us |
Riverview Park Dr
Alafia River Beer Shed
Map data ©2026 Google
## About
The purpose of the project is to preserve and extend the life of the existing pavement through milling and resurfacing on US 301 from south of Balm Riverview Road to north of Lake Street Charles Boulevard in Riverview.
Construction is anticipated to begin in fall of 2028.