| Project Details | |
| Work Type | Pavement Reconstruction |
|---|---|
| Phase | Design |
| Limits | S.R. 686 (Roosevelt Boulevard) from west of 28th Street to east of 28th Street |
| Length | 0.3 miles |
| City | St. Petersburg |
| County | Pinellas |
| Road | SR 686 |
| Contact Information | |
| Design Manager | |
| Dinyar Sharifabad (813) 975-6172 | Dinyar.Sharifabad@dot.state.fl.us |
|---|---|
| Media Contact | |
| Kayla Mejia | 813-975-6060 |
| Kayla.Mejia@dot.state.fl.us | |
This project will mill the existing asphalt pavement and resurface with concrete pavement along State Road (S.R.) 686 from west of 28th Street to east of 28th Street in St. Petersburg.
Construction is anticipated to begin June 2028.