SR 574 (Dr Martin Luther King Jr Boulevard) Repaving from Gallagher Road to Oakbrook Lane 437560-1-52-01

Project Details
Work TypeRepaving
PhaseDesign
Limitsfrom Gallagher Road to Oakbrook Lane
Length4.304 Miles
CityDover
CountyHillsborough
RoadMLK Blvd SR 574

Contact Information

Design Manager

Charlie Xie

813-975-6287

Charlie.Xie@dot.state.fl.us

Media Contact

Kayla Mejia

813-975-6060

Kayla.Mejia@dot.state.fl.us

About

This project will repave SR 574 (Dr. Martin Luther King Jr. Boulevard) from Gallagher Road to Oakbrook Lane in Hillsborough County.

The project is currently in the design phase.

Construction is anticipated to begin Spring 2027.