SR 44 Repaving from US 19 to NE 10th Ave. 441665-1-52-01

Project Details
Work TypeResurfacing
PhaseCompleted
Limitsfrom US 19 to east of NE 10th Ave.
Project StartNovember 7, 2022
Length0.6 miles
CityCrystal River
CountyCitrus
RoadSR 44 US 19
Construction Cost$3.1 million
Estimated CompletionSummer 2023
ContractorC.W. Roberts Contracting, Incorporated

About

As of June 14, 2023, all work was completed and this project was final-accepted from the contractor.

Contact Information

Project Information

John McShaffrey 813-975-6930

roadwork@dot.state.fl.us

This project repaved SR 44 between US 19 and NE 10th Ave. in Crystal River. Additionally, raised medians with dedicated left-turn lanes and mid-block pedestrian crossings were added. The bike lane widths were increased to 5-feet, an 8-foot sidewalk was added to the north side of the roadway, and the existing sidewalk on the south side was repaired, including filling gaps where there was available right of way.

The signalized intersection was improved at US 19 and SR 44, and a new signal was installed at SR 44 and NE 8th Avenue (Dr. Martin Luther King Jr. Avenue).

TRAFFIC SIGNAL UPDATE: The new signal at SR 44 and NE 8th Avenue (Dr. Martin Luther King Jr. Avenue) was put into operation on March 1, 2023.