## I-4 Truck Parking Facility 448698-1-52-01
| Project Details |
| Work Type | Truck Parking Facility |
| Phase | Construction |
| Project Start | September 20, 2025 |
| City | Plant City |
| County | Hillsborough |
| Road | County Line Road I-4 |
| Construction Cost | $29.4 million |
| Estimated Completion | Early 2027 |
| Contractor | Ajax Paving Industries of Florida, LLC |
| Contact Information |
| Project Information |
| Maricelle Venegas\n813-975-6204 |
| Maricelle.Venegas@dot.state.fl.us |
| Media Contact |
| Kayla Mejia\n813-975-6060 |
| Kayla.Mejia@dot.state.fl.us |
Map data ©2025
## About
The FDOT is constructing a new I-4 Truck Parking Facility at the southwest corner of the I-4 and County Line Road interchange in Hillsborough County.
The new I-4 Truck Parking Facility is being built on a 49-acre FDOT-owned site and will provide 160 truck parking spaces.
The new facility will be integrated into Florida’s Truck Parking Availability System (TPAS) to provide drivers with real-time parking availability information via a mobile application and dynamic roadside signs.
Improvements include:
- Replacing the traffic signal and providing dual right and left turn lanes from the eastbound I-4 exit ramp onto County Line Road.
- Adding a traffic signal and providing dual right and left turn lanes from the westbound I-4 exit ramp onto County Line Road.
- Reducing the radii and adding truck aprons to accommodate trucks.
- Modifying traffic signals and reconfiguring travel lanes along County Line Road to reduce truck delays and improve mobility.
• Installing new signage and pavement markings, highway lighting, and ITS systems.
• Installing a 175-foot pole, displaying an 80 x 50-foot American flag and a 30 x 20-foot state of Florida flag