SR 580 (Busch Boulevard) Pedestrian Safety Improvements at N 18th Street and N 22nd Street 441098-3-52-01
| Project Details | |
| Work Type | Pedestrian Safety Improvements |
|---|---|
| Phase | Completed |
| Limits | N 18th Street and N 22nd Street |
| Project Start | September 9,2024 |
| City | Tampa |
| County | Hillsborough |
| Road | Busch Boulevard SR 580 |
| Construction Cost | $1.3 million |
| Estimated Completion | Summer 2025 |
| Contractor | Blacktip Services, Inc. |
To further enhance the safety of the SR 580 (Busch Boulevard) corridor, this project added two midblock pedestrian crossings at N 18th Street and to the east of N 22nd Street in Tampa.
Other improvement included milling and resurfacing the roadway, sidewalk reconstruction, signalization and mast arm installation.
All construction activities associated with this project were completed on May 28, 2025.
Please click on the following links, for information on how to use the Pedestrian Hybrid Beacon. TIP CARD and Information Video
Contact Information
Project Information
Maricelle Venegas 813-975-6204
Maricelle.Venegas@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us