===== PAGE 1 ===== # US 98 Widening from W Socrum Loop Road to CR 54 436673-1-52-01
Project Details
Work TypeWidening
PhaseConstruction
Limitsnorth of W Socrum Loop Road to south of CR 54
Project StartJuly 26, 2023
Length9 miles
CityLakeland
CountyPolk
RoadUS 98
Construction Cost$123.5 million
Estimated CompletionEarly 2028
ContractorPrince-Ajax US 98 Constructors
Contact Information
Project Information\nJohn McShaffrey\n813-975-6930\njohn.mcshaffrey@dot.state.fl.us
Media Contact\nKayla Mejia\n813-975-6060\nKayla.Mejia@dot.state.fl.us
Image
Zephyrhills Upper Hillsborough Zephyrhills Wildlife... 301 CRYSTAL SPRINGS COLONY FARMS Crystal Springs Google Map data ©2023 Google ## About This design-build project is widening US 98 from a two-lane undivided roadway to a 4-lane divided highway from W Socrum Loop Road / Hall Road to the Pasco County line (just south of CR 54 in Pasco County). The contractor is responsible for finalizing the design plans and building the improvements. Two roundabouts will be built at the US 98 intersections at Big Cypress Boulevard and at SR 471. To view a video about driving roundabouts, click here. Shared use paths will be constructed on both sides of the highway from Hall Road / W Socrum Loop Road to just north of Rock Ridge Road. Other work items along the corridor include drainage improvements, wildlife crossings under the roadway, and pedestrian crosswalks at the Rock Ridge Road and Big Cypress Boulevard intersections. A separate widening project in Pasco County is being constructed by the same contracting team. Information on that project can be found at https://www.fdottampabay.com/project/885/443368-3-52-01.