===== PAGE 1 =====
# SR 52 Widening from east of Secretariat Road to east of Ehren Cutoff 256334-3-52-01
| Project Details |
| Work Type | Widening |
| Phase | Design |
| Limits | SR 52 from east of Secretariat Road to east of Ehren Cutoff |
| Length | 3 miles |
| County | Pasco |
| Road | SR 52 |
Contact Information
Design Manager
Omar Chehab
813-975-6468
Omar.Chehab@dot.state.fl.us
Media Contact
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us
Google Bio Control Model... Bay City Flyers
Map data ©2025 Google
## About
This project involves widening SR 52 (Schrader Highway) from the existing two-lane road to a four-lane divided road. To minimize right of way acquisition, the widening will generally occur to the north of the existing roadway. A 12-foot wide multi-use trail will be constructed along the north side of the road as well.
Additional improvements to SR 52 (Schrader Highway) include the construction of two wildlife crossings, a pedestrian underpass, and upgrading the Ehren Cutoff intersection to a signalized, four-leg intersection.
The project is currently under design. Construction is anticipated to begin in Fall 2027.