US 19 Resurfacing from north of NW 7th Ave to south of the Withlacoochee River bridge 447928-1-52-01

Project Details
Work TypeResurfacing
PhaseDesign
Limitsfrom north of NW 7th Ave to south of the Withlacoochee River Bridge
Length9.479 Miles
CityCrystal River
CountyCitrus
RoadUS 19

Contact Information

Design Manager

Dinyar Sharifabad

813-975-6172

Dinyar.Sharifabad@dot.state.fl.us

Media Contact

Kayla Mejia

813-975-6060

Kayla.Mejia@dot.state.fl.us

About

This project will repave US 19 from north of NW 7th Avenue to south of the Withlacoochee River bridge in Citrus County.

The project is currently in the design phase.

Construction is anticipated to begin summer of 2027.