===== PAGE 1 ===== # State Road (S.R.) 50 Corridor Planning Study Overview of Intersection Levels of Service (LOS) and Corridor Travel Times
Simulated Travel Time from County Road (C.R.) 561/12th Street to Bloxam Avenue
TimeLocation (From-To)ExistingExisting Optimized*2040 Optimized*
AMPMAMPMAMPM
Eastbound12th St Approach35.133.731.529.510840.8
12th St to 8th St49.142.749.844.753.654.2
8th St to 5th St40.737.240.437.840.937.5
5st St to East Ave56.348.548.147.161.152.4
East Ave to Bloxam Ave98.9120.78290.8113.1119.5
Total (Sec)280.1282.8251.8249.9376.7304.4
Total (Min)4.74.74.24.26.35.1
WestboundBloxam Ave Approach31.494.643.242.134.4176.4
Bloxam Ave to East Ave80.9104.860.28580.6140.7
East Ave to 5th St4654.441.349.549.754.7
5th St to 8th St34.442.536.940.23739.6
8th St to 12 Street51.266.24550.355.161.3
Total (Sec)243.9362.5226.6267.1256.8472.7
Total (Min)4.16.03.84.54.37.9
What is Level of Service (LOS)? Level of Service is a quantitative measure of traffic operational conditions. Ranges of operation are defined for each type of roadway section (signalized intersections, freeways, ramp junctions and weaving sections) and are related to the amount of traffic demand at a given time as compared to the capacity of that type of roadway section.
Image
*The term "Optimized" refers to traffic signal optimization, which is the process of changing the length of the green light for each traffic movement and the coordination between signalized intersections using a computer software program known as Synchro. Optimizing traffic signal timing reduces both idling and the acceleration of vehicles, leading to less fuel being burned and less carbon dioxide emissions. Source: Maryland Department of Transportation Policy Manual
AM Peak Period Intersection Levels of Service (LOS)
LocationApproach Delay (LOS)
ExistingExisting Optimized2040 Optimized
S.R. 50 @ 12th St15.6(B)20.9(C)42(D)
S.R. 50 @ 8th St8.3(A)8.3(A)13(B)
S.R. 50 @ 5th St14.1(B)19.7(B)25.2(C)
S.R. 50 @ East Ave21.7(C)19(B)34.9(C)
S.R. 50 @ Bloxam Ave67.6(E)30.2(C)53.5(D)
PM Peak Period Intersection Levels of Service (LOS)
LocationApproach Delay (LOS)
ExistingExisting Optimized2040 Optimized
S.R. 50 @ 12th St29(C)16(B)17.8(B)
S.R. 50 @ 8th St7(A)6.7(A)9.3(A)
S.R. 50 @ 5th St15.1(B)7.7(A)12.1(B)
S.R. 50 @ East Ave22.8(C)23.8(C)75.8(E)
S.R. 50 @ Bloxam Ave151.6(F)37.3(D)70.3(E)