• Variable message signs will be in place to alert drivers that work is underway.

S.R. 90 (Tamiami Trail) from Barefoot Williams to Triangle Boulevard: Permit project: Motorists should expect nighttime/overnight lane closures on S.R. 90 northbound and southbound beginning Thursday night, October 8 through Friday night, October 30, 2026, between 7 p.m. and 5 a.m. Crews will be installing shafts for mast arms. Motorists should use caution when traveling through the work zone.

S.R. 90 (Tamiami Trail) at Goodlette Frank Road: Permit project: Motorists should expect nighttime lane closures on S.R. 90 eastbound and westbound beginning Monday, October 26, 2026, between 8 p.m. and 10 p.m. Crews will be flying drones under the bridge. Crews will conduct work during the daytime hours; however, there are no anticipated lane closures. Motorists should use caution when traveling through the work zone.

S.R. 90 (Tamiami Trail) from Pineland Avenue to Goodlette Frank Road: Permit project: Motorists can expect nighttime/overnight lane closures on S.R. 90 westbound beginning Monday, October 26, through Friday, October 30, 2026, between 9 p.m. and 5 a.m. Crews will be performing fiber-optic work and restoration of a handhole. Motorists should use caution when traveling through the work zone.

S.R. 84 (Davis Boulevard) from Santa Barbara Boulevard to Naples Heritage Boulevard: Permit project 2026-H-192-00308: Motorists should expect nighttime/overnight lane closures on S.R. 84 eastbound beginning Monday, October 5 through Friday, October 23, 2026, between 7 p.m. and 5 a.m. Crews will be trenching and directional drilling to install conduit and fiber optic. Motorists should use caution when traveling through the work zone.

S.R. 84 (Davis Boulevard) from West Entrance of Kings Lake Square Plaza to Kings Way: Permit project: Motorists should expect nighttime/overnight westbound lane closures on S.R. 84 beginning Monday, April 14, through Sunday, October 11, 2026. Work will take place between 7 p.m. and 5 a.m. Crews will be installing a communications pole. Motorists should expect slow-moving traffic and delays and use caution when traveling through the work zone.

S.R. 82 from the Hendry County Line to Gator Slough Lane: Construction project: Motorists should expect intermittent eastbound and westbound lane closures during the daytime and nighttime/overnight hours throughout the duration of the project. Work consists of bridge construction, adding lanes and reconstruction, milling and resurfacing, drainage, grass median, sidewalk, guardrail, shared-use path, detention ponds excavation, signalization, lighting, and signing and pavement markings.