S.R. 60 at Old Bartow Lake Wales Road: Permit project: Watch for nighttime/overnight eastbound left turn lane closures and westbound right turn lane closures as crews work at the intersection from 9 p.m. to 6 a.m. through October 31.
S.R. 60 Fort Fraser Trail Bridge between Wilson Avenue and U.S. 17 in Bartow: Construction project: This project includes building a multi-use trail bridge over S.R. 60 to connect the north and south sections of the Fort Fraser Trail. This week crews will install new MSE wall on the north side of S.R. 60, form footers, tie reinforcing steel and place concrete.
S.R. 60 from Rifle Range Road to Alturas Road in Bartow: Maintenance project: Expect nighttime/overnight eastbound lane closures from 8 p.m. to 5:30 a.m. through the end of October while crews work on storm drainage facilities in the median. Use caution and be prepared to merge.
S.R. 37 (Florida Avenue) from Windsor Street to Allamanda Drive: Utility project: Lakeland Electric crews will be replacing wire and poles and adding new poles through early December. Expect northbound nighttime/overnight lane closure from 8 p.m. to 6 a.m. Use caution and be prepared to merge or stop.
S.R. 37 (South Florida Avenue) from Easton Drive to Beacon Road: Permit project: Expect a nighttime/overnight lane closure from 9 p.m. to 5:30 a.m., Monday, October 26 while crews install fiber optic cable. Use caution and be prepared to merge.
S.R. 33 (Lakeland Hills Boulevard) from Parkview Place to Griffin Road in Lakeland: Construction project: Project improvements include roadway reconstruction, milling and resurfacing, placing curb and gutter, installing a new drainage system, widening sidewalk, upgrading signals and lighting, and upgrading water and sewer lines for the City of Lakeland.