S.R. 55 (U.S. 19) from Terra Ceia Road to I-275 (northbound ramp): Asphalt milling and paving operations.
Daytime Closures: From 9 a.m. to 3 p.m., Monday, October 26, through Friday, October 30, motorists should expect lane closures in both the northbound and southbound directions from 23rd Avenue W to Riverfront Boulevard/Manatee River Bridge for sod installation.
Motorists are encouraged to use caution, follow posted signage, and allow additional travel time through the work zone.
The estimated completion date for construction is spring 2027.
15th Street E (S.R. 70 Spur) from 30th Avenue E to 26th Avenue E: Construction project: The Florida Department of Transportation (FDOT) is milling and resurfacing 15th Street E (S.R. 70 Spur) from 30th Avenue E to 26th Avenue E in Manatee County. This safety project's improvements also include installation of new sidewalk and existing sidewalk repairs, drainage work, lighting, signalization, signage and new pavement markings on approximately .25 miles.
Motorists can expect intermittent daytime and nighttime closures throughout the project limits as punch list items are completed.
Pedestrians can expect detours where sidewalks are being repaired or replaced.
Please follow signage and watch for workers in and near the roadway during daytime and nighttime hours.
The estimated completion is in the fall of 2026.
OKEECHOBEE COUNTY
U.S. 98 at 19712 Highway 98 North in Okeechobee County: Permit project: Crews will construct side-drain and driveway-apron improvements at 19712 Highway 98 North.
Work is scheduled to begin Wednesday, October 7, 2026, and continue through Wednesday, October 21, 2026.
Work hours will be from 7 a.m. to 7 p.m.
Crews will remove the existing driveway entrance and reconstruct the driveway from the right-of-way to U.S. 98.