Districtwide Movable Bridges (Lee County): Construction project: The Florida Department of Transportation is installing Intelligent Transportation Systems (ITS) at the S.R. 31 Caloosahatchee River (Wilson Pigott) Bridge in Lee County. This project includes the installation of pedestrian/bicycle detection systems, conduits and electrical components, and connection to bridge tender buildings.
Variable message signs will be in place to alert drivers that work is underway. Estimated completion of testing is in late 2026, weather permitting.
State Roadways (U.S. 41, S.R. 31, S.R. 78, S.R. 80, S.R. 82, S.R. 739, S.R. 865, and S.R. 867): Maintenance contract project: Motorists should expect crews working during the nighttime/overnight hours from 6 p.m. to 6 a.m. Crews are replacing thermoplastic markings on state roadways. Motorists should expect minimal slow-moving traffic and possible delays.
State Roadways (U.S. 41, S.R. 31, S.R. 78, S.R. 80, S.R. 82, S.R. 739, S.R. 865, and S.R. 867): Maintenance contract project: Motorists should expect lane closures during nighttime/overnight hours from 6 p.m. to 6 a.m. Crews are sweeping curb and gutter on state roadways and bridges. Motorists should expect slow-moving traffic and possible delays.