[ ] 08. Proof of Ownership
[ ] 09. Approved Engineering Application
Application and Payment made to the Township Zoning Office.
Review and approval by the Appointed Engineering Firm.
Fees:
Preliminary Engineering - $125.00
Foundation/As-Built - $ 10.00
Final Engineering - $150.00
Development Fee Form or,
C.O.H.A. Fee For.
Requesting a partial release for a footing and foundation permit requires three sets of Architecturally Sealed Plans.
Two (2) sets of Board signed & sealed engineering plans (FULL SIZE) along with Fire Bureau approval seal.
[ ] 12. Energy Sheet and Calculations, if not included on the architectural plans.
a. Two (2) sets shall be Referencing N.J.A.C. 5:23-2.15(f)1.vi, 2.18(b) and 3.18.
[ ] 13. Two (2) sets of the Plumbing and Gas Riser Diagrams shall be submitted, if not included on the architectural plans.
[ ] 14. Two (2) sets of the Electrical Layout Diagram shall be submitted, if not included on the architectural plans.
[ ] 15. Licensed Contractors.
Electrical Contractor
Fire Contractor [Special Alarms & Sprinklers]
Plumbing Contractor
[ ] 16. HVAC Equipment Specifications. Two (2) sets per different device and letter from the builder or architect giving the size of the heating appliance with a diagram of the duct work and flow rate shown.
Fireplace f. Generators
Decks g. Vacuum Systems
Wood & Pellet Stoves h. Fire Sprinkler Systems
Elevator i. Solar Heating/Electrical Systems