1. Township of Jackson, Zoning Officer
  2. Zoning Permit Approval.
  3. [ ] 08. Township of Jackson, Tree Forester
  4. Tree Removal Permit
  5. [ ] 09. Ocean County Soils Conservation, County Erosion Control Specialist approval, if applicable.
  6. Soil Erosion Plan for disturbing more than 5,000 square feet of soil.
  7. Preliminary
  8. Final
  9. [ ] 10. Proof of Ownership
  10. [ ] 11. Approved Engineering Application
  11. Application and Payment made to the Township Zoning Office.
  12. Review and approval by the Appointed Engineering Firm.
  13. Fees:
  14. Preliminary Engineering
  15. Foundation/As-Built
  16. Final Engineering
  17. [ ] 12. Development Fee, determined by Zoning Office, if applicable.
  18. $125.00
  19. $ 10.00
  20. $150.00
  21. Development Fee Form or,
  22. C.O.H.A. Fee For.
  23. [ ] 13. Two (2) sets of Architecturally or Engineered Sealed Plans of the Currently Adopted New Jersey Edition of the International Building Code and One (1) copy of the site plan for review of the handicap access N.J.A.C. 5:23-7.
  24. Requesting a partial release for a footing and foundation permit requires three sets of Architecturally Sealed Plans,
  25. Energy Sheet and Calculations. All plans and specifications submitted must conform to the requirements of the COM Check EZ or ASHRAE 90.1., to include manual heat and cooling loss calculations. [U.S. Department of Energy. www.energy-codes.gov]
  26. [ ] 15. Two (2) sets of the Plumbing and Gas Riser Diagrams shall be submitted, if not included on the architectural plans.
  27. Two (2) sets of the Electrical Layout Diagram shall be submitted, if not included on the architectural plans.