Jackson Township Council Meeting of February 10, 2015
Page 9 of 35
Kilowatts over the first 1000 Kilowatts $864] [$576 + $576 + $288 = $1,440].
Low-voltage systems:
One to 20 devices: $65.
Each additional device: $15.
Installation of second water meter:
Minimum fee:
[1] Residential: $80.
[2] Commercial: $125.
The minimum fee for the annual electrical inspection of each fountain, swimming pool, spa or hot tub shall be $50.
Pool lighting:
Minimum fee:
[1] Residential Permit: $75.
[2] Commercial Permit: $95.
[3] Update Residential Permit: $45
[4] Update Commercial Permit: $65
Fire subcode fee. All fees charged pursuant to this article shall be rounded in accordance with standard mathematical practices (i.e., $105.43 becomes $105, and $198.67 becomes $199).
Installation of gas-/oil-/wood-/coal-/pellet-fired appliances not associated with the Plumbing Code.
The fee for a gas- or oil-fired appliance that is not connected to the plumbing system shall be $65.
Each gas- or oil-fired appliance for commercial construction: $85.
Installation or replacement of a wood stove, fireplace, solid fuel appliance, flue or chimney under the fire subcode responsibility:
[1] Residential: $65.
[2] Commercial: $85.
The fee for each crematorium shall be $511.
The fee for each incinerator shall be $511.
Installation of a residential (R-3, R-4 and R-5) sprinkler system shall be $175.
Standpipes, for each unit installed, shall be $321.
Installation of suppression systems other than sprinklers (CO2, gas, foam, dry or wet chemical), for each unit installed, shall be 129.
Installation of hood, duct and exhaust systems for each unit installed shall be $100.
Installation of smoke/heat detectors (carbon monoxide detectors, notification or initiating devices) and/or sprinkler heads:
For single and multiple-station smoke or heat detectors and fire alarm systems in any one- or two-family dwelling, there shall be a flat fee of $50 per dwelling unit.
One to 20 heads or devices: $91.
Twenty-one to 100 heads or devices: $168.
One hundred one to 200 heads or devices: $321.
Two hundred one to 400 heads or devices: $831.
Four hundred one to 1,000 heads or devices: $1,150.
One thousand one to 1,500 heads or devices: $1,469.
One thousand five hundred one to 2,000 heads or devices: $1,768.
Over 2,000 heads or devices: $168 for each additional 100 heads or devices.
Fuel storage tanks, for each installation/removal:
Installation, 500 gallons or less: $100.