Page 4 of 35
- Plan review.
- (a)For the purpose of N.J.A.C. 5:23-4.18(b)1, the plan review fee shall be 20%.
- (a)For the purpose of N.J.A.C. 5:23-4.18(b)1, the plan review fee shall be 20%.
- (b)The minimum plan review fee shall be:
- [1] Residential Permit: $80.
- [2] Commercial Permit: $125.
- [3] Update Residential Permit: $45.
- [4] Update Commercial Permit: $65
- (c)Request for permit refund. The amount paid as the plan review fee will be deducted from the total permit fee upon issuance. The plan review fee of 20% is nonrefundable.
- (d)The State of New Jersey training fee shall be collected at the rate in effect at the time of the permit issuance per N.J.A.C. 5:23-4.19(b) and shall be rounded to the nearest whole dollar.
- New construction. The fee shall be based upon the volume of the structure.
- (a)Volume computation shall be determined by N.J.A.C. 5:23-2.28; use groups and types of construction are classified and defined in accordance with the provisions of the code most recently adopted by the Township's Building Department in accordance with the Department of Community Affairs, Uniform Construction Code.
- (b)New construction, all use groups (per cubic foot of volume).
- [1] All use groups, with the exception of S-1 and S-2: $0.40 per cubic foot of volume.
- [2] Use Groups S-1 and S-2: $0.032 per cubic foot of volume.
- [3] Minimum fees for Subsection A(2)(b)[1], [2], [3] and [4]
- [4] Structures on farms used exclusively for the purpose of storage of food or grain or sheltering of livestock: $0.012 per cubic foot of volume.
- Modular and premanufactured buildings and moving houses.
- (a)Basic unit set footing and foundation. Fee is based on the estimated cost of work. Refer to Subsection A(4)(a)[1], [2] and [3] for fee per thousand.
- (b)Minimum fee: $250.
- Renovations, alterations and repairs, etc.
- (a)Fees shall be based on the estimated cost of work. (For the purpose of determining the estimated cost, the applicant shall submit to the Construction Official such cost data as may be available, produced by an architect or engineer of record or by a recognized estimating firm or by the contractor. A bona fide contractor's bid may be required. The Construction Official shall make the final decision regarding the estimated cost.)
- [1] One dollar to $50,000 (per thousand):
- [a] Residential: $34.
- [b] Commercial: $36.
- [2] Fifty thousand one dollars to $100,000 (per thousand):
- [a] Residential: add $26.
- [b] Commercial: add $28.
- [3] Over $100,000 (per thousand):
- [a] Residential: add $22.
- [b] Commercial: add $25.
- [4] Minimum fee:
- [a] Residential Permit: $80.
- [b] Commercial Permit: $125.
- [c] Update Residential Permit: $45.
- [d] Update Commercial Permit: $65.
- (b)For the combination of addition and renovation, etc., the sum of the fees shall be computed separately as additions and renovations.