Page 17 of 42
[3] The temporary certificate of occupancy fee and renewal fee shall be paid prior to the renewal of the temporary certificate of occupancy: $39.
- (c)Continued use certificate.
- [1] For Residential R-3, R-4 and R-5 which is requested by the property owner based on Bulletin 06-1, fee is based on the type of work performed and the required subcodes to inspect. All other residential transfer of ownership or rentals shall be referred to the Housing Division.
- [a] Building: $50.
- [b] Electrical: $50.
- [c] Fire: $50.
- [d] Plumbing: $50.
- [2] For all use groups, with the exception of R-3, R-4 and R-5, that are requested by the owner pursuant to the requirements set forth by the Uniform Construction Code as listed under continuous certificate of occupancy and not associated with Chapter 139, Building Standards, Commercial: $200.
- (d)Change of use: refer to Subsection F(1)(a)[1] through [4], Certificate of occupancy.
- (e)Certificate of approval or compliance: no fee applicable.
- (f)Certificate of occupancy motel/hotel. The fee for issuance of a certificate of occupancy applicable to new construction of a motel/hotel shall be $60 for each unit.
- H.Application for a variation in accordance with N.J.A.C. 5:23-2.10.
- Variation.
- (a)Variation fee:
- [1] Class I structures: $821.
- [2] Class II and Class III structures: $176
- [3] Resubmission fee, Class I structures: $321.
- [4] Resubmission fee, Class II and Class III structures: $91.
- I.Reinstatement of lapsed permit.
- Lapsed permit.
- (a)Lapsed permit fees:
[1] Building: $50.
[2] Electrical: $50.
[3] Fire: $50.
[4] Plumbing: $50.
[5] Elevator: All Elevator fees, to include the review and inspections are under the jurisdiction of the State's Elevator Division (Resolution No. 130R-12, March 27, 2012).