Page 16 of 42

[i] Residential: $125.

[ii] Commercial: $150.

  • Fireplace: $90.
  • Chimney Liner: $90.
  • Air Conditioning Unit: $90.
  • A/C coil $20.
  • Backflow preventer: $90.
  • 06-1 Bulletin: $50.
  • Permit reinstatement: $50.
  • Residential minimum fee: $90.
  • Residential permit update: $50.
  • Water service: $90.
  • Sewer service: $90.

G. Certificate of occupancy.

  1. Certificates.
  2. Certificate of occupancy:

[1] Use Groups R-3, R-4 and R-5, per unit: $65.

[2] Use Groups R-1 and R-2, per unit: $75.

[3] All other use groups, per unit: $150.

[4] The fee for issuance of a certificate of occupancy for one- and two-family dwellings shall be $65 per building. In the event that such new construction consists of multiple-family dwellings or condominiums containing more than one unit, each to be occupied separately, then each unit will require a separate inspection and an individual certificate of occupancy, the fee for which shall be $75 per unit. The fee for commercial and industrial buildings shall be 10%, provided that the minimum fee in all cases shall be $150.

(b) Temporary certificate of occupancy.

[1] The fee for the issuance of a temporary certificate of occupancy for one- and two-family dwellings shall be $39 per building. In the event that such new construction consists of multiple-family dwellings or a condominium containing more than one unit, each to be occupied separately, then each unit will require a separate inspection and an individual temporary certificate of occupancy, the fee for which will be $39 per unit. The fee for commercial and industrial buildings, or each separate unit within a building to be occupied, shall be $75.

[2] When the permit applicant chooses to pay the full certificate of occupancy fee at the time of the initial issuance of the temporary certificate of occupancy, there shall be no temporary certificate of occupancy fee for the initial issuance. If the temporary certificate of occupancy is renewed, a temporary certificate of occupancy renewal fee will be charged, even when the certificate of occupancy fee has been paid in full.