Page 13 of 42

  • Photovoltaic systems per each 1,000 kilowatts: $640. [Amended 4-28-2015 by Ord. No. 10-15]
  • Photovoltaic systems per each megawatt: $12,000. [Amended 4-28-2015 by Ord. No. 10-15]
  • Low-voltage systems:
  • (a)One to 20 devices: $65.
  • Each additional device: $15.
  • Installation of second water meter:
  • Minimum fee:
  • [1] Residential: $90.
  • [2] Commercial: $130.
  • The minimum fee for the annual electrical inspection of each fountain, swimming pool, spa or hot tub shall be $100.
  • Pool lighting:
  • Minimum fee:
  • [1] Residential permit: $80.
  • [2] Commercial permit: $95.
  • [3] Update residential permit: $50.
  • [4] Update commercial permit: $70.
  • Commercial signs
  • Per sign $100.
  • Portable pools, hot tubs and spas:
  • Minimum fee:
  • [1] Residential permit: $90.
  • [2] Commercial permit: $130.
  • Fire subcode fee. All fees charged pursuant to this article shall be rounded in accordance with standard mathematical practices (i.e., $105.43 becomes $105, and $198.67 becomes $199).
  • Installation of gas-/oil-/wood-/coal-/pellet-fired appliances not associated with the Plumbing Code.
  • The fee for a gas- or oil-fired appliance that is not connected to the plumbing system shall be $75.
  • Each gas- or oil-fired appliance for commercial construction: $95.
  • Installation or replacement of a wood stove, fireplace, solid fuel appliance, flue or chimney under the fire subcode responsibility: