Page 13 of 42
Photovoltaic systems per each 1,000 kilowatts: $640.
[Amended 4-28-2015 by Ord. No. 10-15]
Photovoltaic systems per each megawatt: $12,000.
[Amended 4-28-2015 by Ord. No. 10-15]
Low-voltage systems:
(a)One to 20 devices: $65.
Each additional device: $15.
Installation of second water meter:
Minimum fee:
[1] Residential: $90.
[2] Commercial: $130.
The minimum fee for the annual electrical inspection of each fountain, swimming pool, spa or hot tub shall be $100.
Pool lighting:
Minimum fee:
[1] Residential permit: $80.
[2] Commercial permit: $95.
[3] Update residential permit: $50.
[4] Update commercial permit: $70.
Commercial signs
Per sign $100.
Portable pools, hot tubs and spas:
Minimum fee:
[1] Residential permit: $90.
[2] Commercial permit: $130.
Fire subcode fee. All fees charged pursuant to this article shall be rounded in accordance with standard mathematical practices (i.e., $105.43 becomes $105, and $198.67 becomes $199).
Installation of gas-/oil-/wood-/coal-/pellet-fired appliances not associated with the Plumbing Code.
The fee for a gas- or oil-fired appliance that is not connected to the plumbing system shall be $75.
Each gas- or oil-fired appliance for commercial construction: $95.
Installation or replacement of a wood stove, fireplace, solid fuel appliance, flue or chimney under the fire subcode responsibility: