Jackson Township Council Meeting of April 24, 2018
Page 12 of 42
Minimum fee:
[1] Residential permit: $90.
[2] Commercial permit: $130.
[3] Update residential permit: $50.
[4] Update commercial permit: $70.
One through 25: $90.
Each additional 25: $19.
Motors or electrical devices (each):
One horsepower to 10 horsepower: $30.
Greater than 10 horsepower to 50 horsepower: $65.
Greater than 50 horsepower to 100 horsepower: $150.
Greater than 100 horsepower to 1,000 horsepower: $640.
Greater than 1,000 horsepower: $640.
Transformers and generators (each):
One kilowatt to 10 kilowatts: $30.
Greater than 10 kilowatts to 45 kilowatts: $65.
Greater than 45 kilowatts to 112.5 kilowatts: $150.
Greater than 112.5 kilowatts: $640.
Service panels, service entrance or subpanel (each):
(a)One to 100 amperes: $80.
From 101 to 200 amperes: $100.
(c)From 201 to 600 amperes: $150.
From 601 to 1,000 amperes: $225.
Greater than 1,000 amperes: $640.
Computing fees. For the purpose of computing these fees, all motors except those in plug-in appliances shall be counted, including control equipment, generators, transformers and all heating, cooking or other devices consuming or generating electrical current.
Signs: counted in Subsection C(1) and (2), fixture and devices.
Photovoltaic systems:
Photovoltaic systems one to 50 kilowatts: $100.
Photovoltaic systems 51 to 100 kilowatts: $216.
Photovoltaic systems 101 to 1,000 kilowatts: $640.