Page 11 of 42
[1] Residential replacement: $90.
[2] Commercial replacement:
[a] Under 100 gallons: $150.
[b] Over 100 gallons: $175.
Septic closure:
[1] Residential: $100.
[2] Commercial: $100 (engineer's certification required).
Oil fixtures:
[1] Each oil fixture: $20.
[2] Minimum fee:
[a] Residential permit: $90.
[b] Commercial permit: $130.
[c]Update residential permit: $50.
[d] Update commercial permit: $70.
[3] Oil underground piping: $30.
Swimming pools, hot tubs and spas:
[1] Bottom drain systems installed: $80.
Testing of backflow preventers:
[1] Minimum fee for each device: $65.
Plumbing minimum fees:
[1] Residential: $90.
[2] Commercial: $130.
A/C evaporator coils: $20.
Residential fuel storage tanks, for each installation:
(a)Installation, 500 gallons or less: $125.
Installation, 501 to 1,000 gallons: $175.
(c)Installation, 1001 50 2,500 gallons: $275.
Installation, 2,501 gallons and over: $525.
Electrical subcode fees. All fees charged pursuant to this article shall be rounded in accordance with standard mathematical practices (i.e., $105.43 becomes $105, and $198.67 becomes $199).
Fixtures or receptacles. Receptacles and fixtures shall include lighting outlets, wall switches, electrical discharge fixtures, convenience receptacles or similar fixtures, and motors or devices of less than one horsepower or one kilowatt, burglar, fire and communications devices, etc.