Page 4

TITLE / DESCRIPTIONPREPARED / SIGNED / SEALED BYDATEDATE LAST REVISED
Traffic Impact AnalysisScott T. Kennel McDonough & Rea Assoc. Inc.1/14/2025
Water Service AvailabilityEarl Quijano Jackson Township MUA5/9/2024
Statement of Utilities5/10/2024
Letter of ConcernsP.O. R. Reiff #278 Jackson Township Traffic Safety Unit8/7/2024
Letter of Approval with ExceptionsScott Rauch Fire Official7/24/2025
Review LetterCharles Horner, P.P. Pinelands Commission5/24/2024
Review Letter7/1/2024
Inconsistent Certificate of Filing12/24/2024

III. ZONING

A. Use:

The subject property is located within the PM-Pinelands Manufacturing Zone District as well as the Conservation Overlay Zone. The Applicant is seeking preliminary and final site plan approval for the construction of a 3-story 15,000 sf office building; a 1-story 12,750 sf warehouse building with 4 units, a 1,575 sf storage shed, a 810 sf pipe storage shed, and an outdoor area for storing small machines.

1. Office Use:

  • Per §244-97A(1) general office facilities is a permitted use.
  • Per §244-97A(2) professional and commercial office facilities is a permitted use.

2. Warehouse Use:

  • Per §244-97A(5) the warehousing or storage of goods and products, provided that no goods are sold from the premises, and provided further that all items to be stored are within an enclosed building.
  • The Applicant shall provide testimony to discuss the warehouse use in detail. The testimony shall include the proposed area for the storage of small machines.

3. Storage Sheds:

  • Per §244-57B(6) accessory uses customarily associated with the industrial, research or office uses permitted in § 244-97A above.
  • The Applicant shall provide testimony to discuss the proposed storage sheds in detail to determine if they are a permitted accessory use.