COPYRIGHT © 2007, CHALLONER & ASSOC. L.L.C.—ALL RIGHTS RESERVED THE COPYRIGHT OR REUSE OF THIS DOCUMENT, OR PORTIONS THEREOF, FOR OTHER THAN THE ORIGINAL PROJECT OR THE PURPOSE ORIGINALLY INTENDED, WITHOUT THE WRITTEN PERMISSION OF CHALLONER & ASSOC. L.L.C., IS PROHIBITED

DATE REVISION STUART CHALLONER, P.E. SOIL EROSION & SEDIMENT CONTROL PLAN

PROFESSIONAL ENGINEER N.J. LIC. NO. 34337 MAJOR SITE PLAN

09/05/2023 PER SOIL CONSERVATION COMMENTS PROFESSIONAL PLANNER N.J. LIC. NO. 4489 JACKSON CENTER FOR

04/10/2022 REVISED PER DOLLAR GENERAL REQUIREMENTS CHALLONER & ASSOCIATES LOTS 1 AND 2 BLOCK 22301 SITUATED IN

08/04/2021 REVISED PER COUNTY ENGINEER COMMENTS L.L.C. Certificate of Auth. No. 24GA28057700 TOWNSHIP OF JACKSON OCEAN COUNTY, NEW JERSEY

05/11/2020 REVISED PER COUNTY ENGINEER COMMENTS

05/15/19 ADDED SIDEWALK CONNECTION CONSULTING ENGINEERS AND DESIGN PROFESSIONALS

04/14/10 REVISED PER COUNTY ENGINEER COMMENTS 215 Main Street, 2nd Floor Tama River, New Jersey 08753

02/17/10 REVISED PER SCD REVIEW Phone: 732-818-9980 Fax: 732-818-9981

08/20/09 REVISED PER TOWNSHIP ENGINEER COMMENTS

02/05/09 REVISED ENTRANCES Date: Scale: Drawn By: Checked By: File No.: Field Book:

03/04/08 REVISED PER PINELANDS COMMENTS MARCH 30, 2007 1"=30' B.F.G. S.C.C. 06015 Sheet No.: 7 of 18

PRIOR TO ANY EXCAVATION, CONTRACTOR TO CALL 1-800-272-1000 FOR UTILITY MARKOUT.

Existing utility information shown herein has been collected from various sources and is not guaranteed as to accuracy or completeness. The contractor shall verify all information to his satisfaction prior to excavation. Where existing utilities are to be crossed by proposed construction, test pits shall be dug by the contractor prior to construction. To ascertain existing inverts, materials, and sizes, test pit information shall be given to the engineer prior to construction to permit adjustment as required to avoid conflicts.

DATEREVISION
06/11/2025PER SOIL CONSERVATION COMMENTS
04/28/2025PER SOIL CONSERVATION COMMENTS
12/01/2023PER SOIL CONSERVATION COMMENTS

THIS PLAN TO BE USED FOR SOIL EROSION AND SEDIMENT CONTROL PURPOSES ONLY.