| X-Items |
| Pay item | Description | Quantity Unit | Unit Price | Extended Amount |
|---|
| 110-1-1 | CLEARING & GRUBBING | 0.11 AC | 22,500.00 | 2,475.00 |
| Comment: To fill sidewalk gap on Brevard St | | | |
| 110-4-10 | REMOVAL OF EXIST CONC | 14.00 SY | 46.00 | 644.00 |
| Comment: To fill sidewalk gap on Brevard St | | | |
| 327-70-4 | MILLING EXIST ASPH PAVT, 3" AVG DEPTH | 4,744.00 SY | 3.25 | 15,418.00 |
| Comment: Milling side streets | | | |
| 334-1-53 | SUPERPAVE ASPH CONC, TRAF C, PG76-22 | 392.00 TN | 160.00 | 62,720.00 |
| Comment: 1.5" for side streets, 4744 × 165/2000 = 392 TN | | | |
| 337-7-83 | ASPH CONC FC,TRAFFIC C,FC-12.5,PG 76-22 | 392.00 TN | 169.25 | 66,346.00 |
| Comment: 1.5" for side streets, 4744 × 165/2000 = 392 TN | | | |
| 520-1-10 | CONCRETE CURB & GUTTER, TYPE F | 65.00 LF | 52.25 | 3,396.25 |
| Comment: To fill sidewalk gap on Brevard St | | | |
| 522-1 | CONCRETE SIDEWALK AND DRIVEWAYS, 4" | 58.00 SY | 86.00 | 4,988.00 |
| Comment: To fill sidewalk gap on Brevard St | | | |
| 523-3 | PATTERNED PAVEMENT | 264.00 SY | 150.50 | 39,732.00 |
| Comment: For patterned crosswalks | | | |
| 710-11-101 | PAINTED PAVT MARK,STD,WHITE,SOLID,6" | 0.19 GM | 1,585.00 | 301.15 |
| 710-11-123 | PAINTED PAVT MARK,STD,WHITE,SOLID, 12" | 200.00 LF | 1.75 | 350.00 |
| 710-11-125 | PAINTED PAVT MARK,STD,WHITE,SOLID,24" | 211.00 LF | 2.75 | 580.25 |
| 710-11-170 | PAINTED PAVT MARK,STD,WHITE, ARROWS | 1.00 EA | 45.00 | 45.00 |
| 710-11-201 | PAINTED PAVT MARK,STD,YELLOW,SOLID,6" | 0.19 GM | 1,585.00 | 301.15 |
| 711-11-123 | THERMOPLASTIC, STD, WHITE, SOLID, 12" | 200.00 LF | 4.00 | 800.00 |
| 711-11-125 | THERMOPLASTIC, STD, WHITE, SOLID, 24" | 211.00 LF | 7.75 | 1,635.25 |
| 711-11-170 | THERMOPLASTIC, STD, WHITE, ARROW | 1.00 EA | 95.00 | 95.00 |
| 711-16-101 | THERMOPLASTIC, STD-OTH, WHITE, SOLID, 6" | 0.19 GM | 5,550.00 | 1,054.50 |
| 711-16-201 | THERMOPLASTIC, STD-OTH,YELLOW, SOLID, 6" | 0.19 GM | 5,550.00 | 1,054.50 |
| 714-10 | GREEN-COLORED PAVEMENT MARKINGS, BIKE LN | 1,652.00 SF | 11.00 | 18,172.00 |
| Comment: For green bike lane | | | |
| Roadway Component Total | | | 220,108.05 |