Sequence: 4 MIS - Miscellaneous Construction Description: New sidewalk to fill gaps along corridor
Net Length: 0.010 MI 53 LF
ROADWAY COMPONENT
X-Items
Pay itemDescriptionQuantity UnitUnit Price Extended Amount
110-1-1CLEARING & GRUBBING0.32 AC$22,500.00$7,200.00
515-2-311PED/BICYCLE RAILING, ALUM,42" TYPE 1140.00 LF$111.00$15,540.00
522-1CONCRETE SIDEWALK AND DRIVEWAYS, 4"1,565.00 SY$86.00$134,590.00
522-2CONCRETE SIDEWALK AND DRIVEWAYS, 6"54.00 SY$117.00$6,318.00
Roadway Component Total$163,648.00
SHOULDER COMPONENT
User Input Data
Description
Value
X-Items
Pay itemDescriptionQuantity UnitUnit Price Extended Amount
104-10-3SEDIMENT BARRIER Comment: Erosion control is included in main sequences 1-3100.00 LF$2.75$275.00
570-1-2PERFORMANCE TURF, SOD1,259.00 SY$6.25$7,868.75
Shoulder Component Total$8,143.75
DRAINAGE COMPONENT
X-Items
X-Items
Pay itemDescriptionQuantity UnitUnit Price Extended Amount
425-1-551INLETS, DT BOT, TYPE E, <10'5.00 EA$8,500.00$42,500.00
425-1-910INLETS, CLOSED FLUME1.00 EA$8,000.00$8,000.00
425-11MODIFY EXISTING DRAINAGE STRUCTURE1.00 EA$4,420.00$4,420.00
430-175-118PIPE CULV, OPT MATL, ROUND, 18"S/CD336.00 LF$201.75$67,788.00
Drainage Component Total$122,708.00
Sequence 4 Total$294,499.75