Description: SR 5 (US 1) from Grace St to SR 405/Garden St (MP 3.078 to MP 4.090) Northbound only. Includes intersection lighting retrofit for 3 signals and 2 poles for midblock crossings.
ROADWAY COMPONENT
User Input Data
Description Value
Number of Lanes 2
Roadway Pavement Width L/R 11.00 / 11.00
Structural Spread Rate 165
Friction Course Spread Rate 165
Pay Items
Pay item Description Quantity Unit Unit Price Extended Amount
327-70-4 MILLING EXIST ASPH PAVT, 3" AVG DEPTH 13,061.55 SY $3.25 $42,450.04
334-1-53 SUPERPAVE ASPH CONC, TRAF C, PG76-22 1,077.58 TN $160.00 $172,412.80
337-7-83 ASPH CONC FC,TRAFFIC C,FC-12.5,PG 76-22 1,077.58 TN $169.25 $182,380.42
| X-Items |
| Pay item | Description | Quantity Unit | Unit Price | Extended Amount |
|---|
| 110-1-1 | CLEARING & GRUBBING | 0.03 AC | $22,500.00 | $675.00 |
| Comment: Sod removal for curb ramp work | | | |
| 110-4-10 | REMOVAL OF EXIST CONC | 267.00 SY | $46.00 | $12,282.00 |
| Comment: 20 curb ramps for ADA reconstruction | | | |
| 327-70-1 | MILLING EXIST ASPH PAVT, 1" AVG DEPTH | 654.00 SY | $4.25 | $2,779.50 |
| Comment: Deeper rehab for 5% of project (13,061.55 * 0.05 = 654 SY) | | | |
| 327-70-4 | MILLING EXIST ASPH PAVT, 3" AVG DEPTH | 2,107.00 SY | $3.25 | $6,847.75 |
| Comment: 7 turn lanes, approx. 10-ft wide x 185ft long (avg) = 1439 SY South St milling between NB and SB legs, 668 SY | | | |
| 334-1-13 | SUPERPAVE ASPHALTIC CONC, TRAFFIC C | 211.00 TN | $319.00 | $67,309.00 |
| Comment: 1" for deeper rehab for 5% of project = 654 * 110/2000 = 36 TN 1.5" lift for 7 turn lanes = 1439 * 165/2000 = 119 TN 1.5" lift for South St = 668 *165/2000 = 56 TN | | | |
| 337-7-83 | ASPH CONC FC,TRAFFIC C,FC-12.5,PG 76-22 | 175.00 TN | $169.25 | $29,618.75 |
| Comment: 1.5" for 7 turn lanes = 1439 * 165/2000 = 119 TN 1.5" for South St = 668 *165/2000 = 56 TN | | | |
| 520-1-10 | CONCRETE CURB & GUTTER, TYPE F | 300.00 LF | $52.25 | $15,675.00 |
| Comment: 20 curb ramps for ADA reconstruction | | | |
| 522-1 | CONCRETE SIDEWALK AND DRIVEWAYS, 4" | 84.00 SY | $86.00 | $7,224.00 |
| Comment: Sidewalk impacts for curb ramp reconstruction | | | |
| 522-2 | CONCRETE SIDEWALK AND DRIVEWAYS, 6" | 200.00 SY | $117.00 | $23,400.00 |
| Comment: 20 curb ramps for ADA reconstruction, 10 SY each | | | |
| 527-2 | DETECTABLE WARNINGS | 240.00 SF | $35.00 | $8,400.00 |
| Comment: 20 curb ramp reconstructions at 12 SF each | | | |