Sequence: 2 RSD - Resurfacing, Divided
Net Length: 1.303 MI 6.880 LF
Description: SR 5 (US 1) from Alhambra St to Grace St (MP 1.775 to MP 3.078). Includes intersection lighting retrofit for 4 signals.
ROADWAY COMPONENT
User Input Data
Description Value
Number of Lanes 4
Roadway Pavement Width L/R 24.00 / 24.00
Structural Spread Rate 165
Friction Course Spread Rate 165
Pay Items
Pay item Description Quantity Unit Unit Price Extended Amount
327-70-4 MILLING EXIST ASPH PAVT, 3" AVG DEPTH 36,692.48 SY $3.25 $119,250.56
334-1-53 SUPERPAVE ASPH CONC, TRAF C, PG76-22 3,027.13 TN $160.00 $484,340.80
337-7-83 ASPH CONC FC,TRAFFIC C,FC-12.5,PG 76-22 3,027.13 TN $169.25 $512,341.75
X-Items
Pay itemDescriptionQuantity UnitUnit PriceExtended Amount
110-1-1CLEARING & GRUBBING0.31 AC22,500.006,975.00
Comment: Median modifications and sod removal
110-4-10REMOVAL OF EXIST CONC789.00 SY46.0036,294.00
Comment: 10 curb ramps ADA in-kind(140 SY) & 25 curb ramps ADA recon with addtl drainage/sdwlk impacts(467 SY). Driveway apron removal at pelican pt(100 SY). Curb rmvl @ Harrison(28SY). Dwy rmvl 1.85(54SY)
160-4TYPE B STABILIZATION127.00 SY26.003,302.00
Comment: Asphalt reconstruction of existing driveway apron at Pelican Pt (100 SY). Median widening at Harrison (27 SY).
285-701OPTIONAL BASE,BASE GROUP 01100.00 SY37.503,750.00
Comment: Asphalt reconstruction of existing driveway apron at Pelican Pt (100 SY).
285-709OPTIONAL BASE,BASE GROUP 0927.00 SY93.002,511.00
Comment: Median widening at Harrison (27 SY).
327-70-1MILLING EXIST ASPH PAVT, 1" AVG DEPTH1,835.00 SY4.257,798.75
Comment: Deeper rehab for 5% of project, 36,692.48 × 0.05 = 1835 SY
327-70-4MILLING EXIST ASPH PAVT, 3" AVG DEPTH7,016.00 SY3.2522,802.00
Comment: 28 Turn lanes × 11-ft (avg) × 205-ft (avg) = 7,016 SY
334-1-53SUPERPAVE ASPH CONC, TRAF C, PG76-22694.00 TN160.00111,040.00
Comment: 1" for deeper rehab for 5% (1835 × 110/2000 = 101 TN 1.5" for 28 turn lanes (7016 × 165/2000 = 579 TN) 1.5" for Pelican Pt (100SY × 165/2000 = 9TN) 3" for median widening at Harrison (26.2 ×330/2000)
337-7-83ASPH CONC FC, TRAFFIC C,FC-12.5,PG 76-22591.00 TN169.25100,026.75
Comment: 1.5" for 28 turn lanes (7016 × 165/2000 = 579 TN) 1.5" for Pelican Pt turnout (100SY × 165/2000 = 9TN) 3" for median widening at Harrison (26.2 ×165/2000 = 3 TN)