Ad Number: 27533
FPID Nos.: 454217-1 LEAD
454217-2
U.S. 1 RESURFACING
From S.R. 50 to S.R. 406 (Garden Street)
U.S. 1 at S.R. 50 Signal Replacement
Selection Team
District Designee (DD): Heidi Trivett:
TRC: Marianne Saunders Tricia Ballard Tyler Burgett Project Manager: Gene Varano
CONSULTANT PROJECT MANAGEMENT (CPM)
## Grading Criteria
Technical Approach
50%
Management Plan
30%
Innovation
20%
www.CFLRoads.com/D5FDOTDesign
## Procurement Schedule
Advertisement
9-14-2026
Responses Due
9-28-2026
## Shortlist Selection
10-19-2026
## Final Selection
11-16-2026
Expected Execution
DRIVE Analysis
1-12-2027
DESIGN
4-16-2027
===== PAGE 2 =====
## What to Know About the Projects
Project 454217-1 (lead project) is a 3R (Resurfacing, Restoration and Rehabilitation) project along 4.141 miles of U.S. 1 (State Road 5) in the City of Titusville, Brevard County. The project includes only the northbound side of the one-way pairs.
There are three typical sections within the project limits, and no changes are proposed. Generally, this segment of U.S. 1 is a four-lane divided highway that includes both flush shoulder and curb & gutter sections. No changes are proposed for any of the 11 signalized intersections within the project limits. Intermittent sidewalk is present, and there is an 8-foot-wide parking lane from Alhambra Street to Grace Street. Pedestrian improvements are limited to removing sidewalk gaps only when it is possible without drainage or right of way impacts.
Additionally, there are decorative crosswalks and green pavement markings in some areas. The Department confirmed with the City that the design will not restore these features. The design team is expected to coordinate with the City for minimal side street resurfacing at the City's expense.
Project 454217-2 is a goes-with project that proposes to reconstruct the existing mast arm signal at U.S. 1 and S.R. 50. No intersection reconfiguration is desired. Temporary span wire may be used to allow the mast arms to be replaced within the existing locations.
## What Should be Shown in the Letters
Some of the key elements that the selection team will be looking for in the Letters of Response include:
• An understanding both projects.
An understanding of the DRIVE process and goals.
• Constructable innovation that will deliver the DRIVE initiative.
• Your team's recommendations instead of options.
Contact FDOT Project manager Gene Varano
Gene.Varano@dot.state.fl.us
Selection Method:
INTERVIEW
(includes both
projects)
Contract Amount:
$2,950,000.00
Design Schedule:
18 to 24 months
Letting 2-28-2029
Work Types:
3.1, 4.1, 6.2, 6.2, 6.3.1, 7.1, 7.2, 7.3, 8.1, 8.2, 8.3, 9.1, 9.2