3
Location: Grawntown Road
P/F Major Subdivision to include P/F S/P conditional use – Proposal to subdivide the existing lot into 21 SFD to include 4
Affordable Housing & 1 Storm Water Lot
Engineer: PDS
Attorney: Adam Pfeffer, Esq.
Date Complete: 12/4/20
Decision Due Date: Time waived to 8/16/21
Hearing Status: Testimony given 5/3/21, 7/19/21
Eligible: Dolan Campbell Biker Jozwicki Luisi Wall Flemming Hudak
Eligible: Dolan, Campbell, Riker, Jozwicki, Luisi, Wall, Flemming, Hudak
Location: Grawntown Road
Final Major Site Plan
Engineer: PDS
Attorney: John Giunco, Esq.
Date Complete: 5/26/21
Hearing Status: Initial Testimony
Location: 406 Bennetts Mills Road
Amended Minor Site Plan to convert an existing Animal Care Facility to an 1800 SF Professional Office Building
Engineer: Glenn D. Lines
Attorney: Adam Pfeffer, Esq.
Date Complete: 6/2/21
Hearing Status: Initial Testimony
No applications at this time
Location: 440 N. County Line Road
P/F Major Site Plan – (7) contractor warehouses – 115,800 SF total warehouse area
Engineer: FWH Associates
Attorney: Salvatore Alfieri, Esq.
Date Complete: 1/27/21
Decision Due Date: Time Waived to 10/4/21
Hearing Status: Testimony given 6/7/21
Eligible: Dolan, Campbell, Luisi, Brito, Wall, Flemming, Riccardi, Haring, Hudak
Eligible: Dolan, Campbell, Luisi, Brito, Wall, Flemming, Riccardi, Haring, Hudak
P/F Major Site Plan to construct 11,305 SF two story professional office
Engineer: Haler Consulting
Attorney: Salvatore Alfieri, Esq.
Date Complete: 11/5/20
Decision Due Date: Time waived to
Hearing Status: Testimony given 5/3/21, 7/19/21
Eligible: Dolan, Campbell, Riker, Jozwicki, Luisi, Wall, Flemming, Hudak