2
Location: 2180 W. County Line Road
P/F Minor Site Plan – to construct a new two-story 6,000 SF office building with associated off street parking space, lighting, landscaping, stormwater management facilities
Engineer: DW Smith
Attorney: Salvatore Alfieri, Esq.
Date Complete: 11/19/20
Hearing Status: Approved
Eligible: Jozwicki Luisi Brito Wall Flemming Haring Hudak
Eligible: Jozwicki, Luisi, Brito, Wall, Flemming, Haring, Hudak
Location: 211 Brewers Bridge Road
P/F Major Subdivision to create 6 residential lots and 1 stormwater management lot
Engineer: Professional Design Services, LLC
Attorney: Adam Pfeffer, Esq.
Date Complete: 3/12/21
Hearing Status: Approved
Eligible: Dolan, Campbell, Biker, Luisi, Wall, Flemming, Riccardi, Haring, Hud
Eligible: Dolan, Campbell, Riker, Luisi, Wall, Flemming, Riccardi, Haring, Hudak
Location: Green Valley Road
Preliminary Major Subdivision – 15 residential building lots (6 existing; 9 proposed)
Engineer: WJH Engineering
Attorney: Adam Pfeffer, Esq.
Date Complete: Time waived to 6/7/21
Hearing Status: Testimony given 5/10/21
Eligible: Dolan, Campbell, Riker, Luisi, Brito, Wall, Flemming, Riccardi, Haring
Location: 440 N. County Line Road
P/F Major Site Plan – (7) contractor warehouses – 115,800 SF total warehouse area
Engineer: FWH Associates
Attorney: Salvatore Alfieri, Esq.
Date Complete: 1/27/21
Decision Due Date: Time Waived to 6/30/21
Hearing Status: Initial Testimony
Location: 584 Cedar Swamp Road
P/F Major Subdivision and Major Site Plan
Engineer: Stonefield Engineering & Design, LLC
Attorney: Dennis Collins, Esq.
Date Complete: 1/27/21
Decision Due Date: Time waived to 6/21/21
Hearing Status: Testimony given 4/19/21
Eligible: Dolan, Campbell, Riker, Jozwicki, Brito, Wall, Flemming, Ri
Hudak