DUBUQUE COUNTY
DATA CENTER ORDINANCE DEVELOPMENT ROADMAP
A CLEAR PROCESS. PROTECTING LAND. SERVING PEOPLE. PLANNING FOR THE FUTURE.
ESTABLISH THE FOUNDATION
PUBLIC
VISIONING
COMPREHENSIVE PLAN CONSISTENCY
FACT FINDING
- Adopt guiding principles
that drive every decision
and ordinance provision.
- Conduct independent technical assessments
(not developer-provided).
- Engage the public early and meaningfully.
- Ensure all policies align with the Comprehensive Plan.
- Verify compatibility with future land use, agricultural, conservation, and infrastructure goals.
- Use “conditions” approach.
- Define County priorities.
- Land, utilities, environment, infrastructure, community, and economic analysis.
- Hold workshops and stakeholder meetings.
- Affirm commitment to public health & safety, land preservation, and fiscal responsibility.
- Do not rely on developer-provided data.
and priorities.
- No ordinance language should contradict the Plan
- Document community values and priorities.
- Ensure transparent public process.
- Map exclusion areas:
prime farmland, floodplains,
wetlands, karst, parks,
schools, scenic corridors,
historic resources, etc.
- Identify only limited Opportunity Areas.
INFRASTRUCTURE CAPACITY STUDY
FISCAL IMPACT ANALYSIS
- Require applicant-funded, independent studies.
- Conduct independent fiscal impact review.
- Evaluate electrical, water, wastewater, roads, bridges, fiber, emergency services, and more.
- Evaluate revenues, expenses, services, infrastructure, long-term maintenance, and opportunity costs.
- No approval until deficiencies are identified and funded. Net fiscal benefit must be demonstrated over 30 years.
RISK ASSESSMENT
- Assess environmental, economic, and community risks.
- Identify and evaluate potential short- and long-term impacts.
- Plan for mitigation and contingencies.
ORDINANCE FRAMEWORK
PUBLIC REVIEW & ADOPTION
- Draft ordinance with clear standards and requirements.
- Publish draft for public review (minimum 30 days).
- Include zoning, siting, environmental, operational, performance, monitoring, financial assurance, enforcement, and decommissioning.
- Planning & Zoning, Township, Utility, and Legal review.
- Public hearing(s).
- Revise as needed.
POST-ADOPTION IMPLEMENTATION & OVERSIGHT
- Require annual reporting from data center operators.
- Monitor compliance through inspections and audits.
- Report publicly on performance and impacts.
- Review ordinance annually and update as needed.
ANNUAL REPORTS SHOULD INCLUDE:
- Water use • Tax revenue
- Electrical consumption • Environmental monitoring
- Jobs and payroll
- Noise and light complaints
Emergency responses
- Emergency responses
- Compliance history
- Decommissioning fund status
ORDINANCE KEY COMPONENTS (INCLUDED IN PHASE 9)
SITING STANDARDS
INFRASTRUCTURE REQUIREMENTS
OPERATIONAL STANDARDS
PERFORMANCE STANDARDS
PUBLIC HEALTH & SAFETY
FINANCIAL ASSURANCE
ENFORCEMENT
- Setbacks & buffers • Noise • Road improvements
- Emergency plans
- Max decibel levels
- Protect public health
- Max decibel levels
Max light spill
- Protect public health
- Road bond
- Annual inspections | Inspections
- Define data center.
- Minimum acreage • Lighting
- Bridge improvements | Hazardous materials
- Max light spill
- Emergency response
- Stormwater bond
- Violations
- Emergency response coordination
- Independent audits
- campus, expansion.
- Max footprint Heat
- Traffic control
- Generator testing
- Max water use coordination• Landscaping bond• Water monitoring
- Landscaping bond
- Civil penalties
- and accessory uses
- Air emissions
- Utility upgrades • Battery storage
- Max emissions
- Fire safety
- Decommissioning
- Noise testing
- Fire safety
- Maintenance
- Chemical & fuel storage safety
- Specify when permits
- Fiber
- Maintenance
- Max vibration storage safety bond • Lighting verification
- Permit revocation
- are required
• Setbacks & buffers
- Building height limits
- Water conservation
- Utility restoration bond
- Power
- Snow removal
- Annual reporting
- Injunction authority
- Air & water quality protection
- Never permitted
- Minimum acreage
- Road frontage
- Wetlands
- Water
- Security
- Never p
by right
- by right • Visual screening & • Groundwater
- Environmental
- [F
- [F23]
- [F22]
- [F2]
- landscaping
- Tree preservation
- cleanup bond
- [F3] 2 [F4]
- [F25] [F7] [F22]
- Dust
DECOMMISSIONING
Foundation Utility
Equipment
Foundation Removal
Soil
Removal Removal Removal Restoration
Removal
Agricultural
Agricultural
Restoration
Bond release only after completion
CROSS-CUTTING PRINCIPLES
AVOIDANCE – Can impacts be avoided?
MINIMIZATION – Can remaining impacts be reduced?
MITIGATION – Can unavoidable impacts be offset?
MONITORING – Will compliance be verified over time?
ENFORCEMENT – Are meaningful remedies available?
DECISION GATE MATRIX (ALL GATES MUST BE PASSED)
1 Comprehensive Plan Consistent with adopted county plans.
2 Site Suitability Outside exclusion areas or meets strict exceptions.
3 Infrastructure Capacity exists or upgrades are fully funded by developers.
4 Environmental Protection Independent studies demonstrate compliance.
5 Fiscal Neutrality Public costs fully covered and long-term benefits demonstrated.
6 Community Compatibility Noise, lighting, traffic, visual impacts meet standards.
7 Financial Assurance Bonds and guarantees in place before construction.
8 Public Interest Board finds project advances public health, safety, and welfare.
10100000000
U
PROTECT LAND. PROTECT RESOURCES. PROTECT OUR FUTURE.