| ALTERNATIVES EVALUATION MATRIX | |||||
| ALTERNATIVE # | |||||
| EVALUATION CRITERIA | No Build | Alternative # 1 Hybrid Flow | Alternative # 2 Normal Flow | Alternative # 3 Clockwise Flow | |
| Description | Traffic Pattern | Counter-Clockwise | Counter-Clockwise | Counter-Clockwise | Clockwise |
| Truck Parking Options | Maintains the existing Facility as-is | Provides both "Pull-Thru" and "Back-In" | Provides both "Pull-Thru" and "Back-In" | Provides both "Pull-Thru" and "Back-In" | |
| Purpose & Need | |||||
| Improves Safety Condition | X | ✓ | ✓ | ✓ | |
| Increases Truck Parking | X | ✓ | ✓ | ✓ | |
| Improves Modal Relationships | X | ✓ | ✓ | ✓ | |
| # of Parking Spaces | |||||
| Truck | 43 | 139 | 121 | 143 | |
| Personal Vehicle | 75 | 51 | 51 | 48 | |
| Sociocultural Resources | |||||
| Provides multimodal mobility and accessibility | ✓ | ✓ | ✓ | ✓ | |
| Archeological & Historic Sites | X | X | X | X | |
| Utilities | |||||
| Cost effective utility connections | ✓ | ✓ | ✓ | ✓ | |
| Right Of Way | |||||
| Requires Additional Right of Way | X | X | X | X | |
| Drainage and Wetlands | |||||
| Impacted Wetlands (acres) (includes secondary impacts) | 0 | 6.2 | 6.6 | 6.4 | |
| Potential impacts to existing drainage infrastructure | X | Minor | Minor | Minor | |
| Threatened & Endangered Species | X | X | X | X | |
| Connection to Daniels Parkway sidewalks | X | ✓ | ✓ | ✓ | |
| Connection to existing Daniels Parkway bus stop | X | ✓ | ✓ | ✓ | |
| Enhanced Amenities | |||||
| Expanded Rest Room Facilities | X | ✓ | ✓ | ✓ | |
| Dog Walk / Park | ✓ | ✓ | ✓ | ✓ | |
| Picnic Shelters | ✓ | ✓ | ✓ | ✓ | |
| Children's Recreational Area | X | ✓ | ✓ | ✓ | |
| Walking Trail | X | ✓ | ✓ | ✓ | |
| Lake View areas | ✓ | ✓ | ✓ | ✓ | |
| Informational placards | ✓ | ✓ | ✓ | ✓ | |
| Truck Washing / Maintenance Area | X | ✓ | ✓ | ✓ | |
| Estimated Costs | |||||
| Wetland Mitigation | $0 | $500,000 | $500,000 | $500,000 | |
| Right of Way | $0 | $0 | $0 | $0 | |
| Design | $0 | $3,500,000 | $3,500,000 | $3,500,000 | |
| Construction (includes cost of building) | $0 | $37,000,000 | $37,000,000 | $37,000,000 | |
| Construction Engineering & Inspection | $0 | $2,960,000 | $2,960,000 | $2,960,000 | |
| Preliminary Estimate of Total Project Costs | $0 | $43,960,000 | $43,960,000 | $43,960,000 | |
| Preliminary Analysis - Subject to Change | |||||