Lee County Rest Area Feasibility Study Financial Project Indentification Number: 452377-1-22-01
LEGENDX = No✓ = Yes
ALTERNATIVES EVALUATION MATRIX
ALTERNATIVE #
EVALUATION CRITERIANo BuildAlternative # 1 Hybrid FlowAlternative # 2 Normal FlowAlternative # 3 Clockwise Flow
DescriptionTraffic PatternCounter-ClockwiseCounter-ClockwiseCounter-ClockwiseClockwise
Truck Parking OptionsMaintains the existing Facility as-isProvides both "Pull-Thru" and "Back-In"Provides both "Pull-Thru" and "Back-In"Provides both "Pull-Thru" and "Back-In"
Purpose & Need
Improves Safety ConditionX✓✓✓
Increases Truck ParkingX✓✓✓
Improves Modal RelationshipsX✓✓✓
# of Parking Spaces
Truck43139121143
Personal Vehicle75515148
Sociocultural Resources
Provides multimodal mobility and accessibility✓✓✓✓
Archeological & Historic SitesXXXX
Utilities
Cost effective utility connections✓✓✓✓
Right Of Way
Requires Additional Right of WayXXXX
Drainage and Wetlands
Impacted Wetlands (acres) (includes secondary impacts)06.26.66.4
Potential impacts to existing drainage infrastructureXMinorMinorMinor
Threatened & Endangered SpeciesXXXX
Connection to Daniels Parkway sidewalksX✓✓✓
Connection to existing Daniels Parkway bus stopX✓✓✓
Enhanced Amenities
Expanded Rest Room FacilitiesX✓✓✓
Dog Walk / Park✓✓✓✓
Picnic Shelters✓✓✓✓
Children's Recreational AreaX✓✓✓
Walking TrailX✓✓✓
Lake View areas✓✓✓✓
Informational placards✓✓✓✓
Truck Washing / Maintenance AreaX✓✓✓
Estimated Costs
Wetland Mitigation$0$500,000$500,000$500,000
Right of Way$0$0$0$0
Design$0$3,500,000$3,500,000$3,500,000
Construction (includes cost of building)$0$37,000,000$37,000,000$37,000,000
Construction Engineering & Inspection$0$2,960,000$2,960,000$2,960,000
Preliminary Estimate of Total Project Costs$0$43,960,000$43,960,000$43,960,000
Preliminary Analysis - Subject to Change