===== PAGE 1 ===== ## CITY OF VICTORVILLE Annual Development Impact Fee Report Fiscal Year Ended June 30, 2023 December 21, 2023 Prepared by: NBS for the CITY OF VICTORVILLE
Image
===== PAGE 2 ===== ## City of Victorville
Image
## City Officials Elizabeth Becerra, Mayor Blanca Gomez, Council Member Bob Harriman, Council Member Leslie Irving, Council Member Debra Jones, Council Member Officers Jennifer Thompson, City Clerk ## Administrative Team Keith Metzler, City Manager Jenele Davidson, Deputy City Manager Sophie Smith, Deputy City Manager Andre De Bortnowsky, City Attorney Rmen Cun, Director of Finance/City Treasurer ===== PAGE 3 ===== ## TABLE OF CONTENTS 1. Development Impact Fee Report.....1 1.1 Annual Report .....1 1.2 Five-Year Report.....2 2. Current Impact Fees & Capacity Charges.....4 2.1 Types of Impact Fees, Capacity Charges and Associated Funds.....4 2.2 Current Fee Schedule.....6 3. Financial Summary Report.....7 4. Public Improvements.....8 5. Interfund Loans.....10 6. Refunds.....11 Attachment 1 - Development Impact Fees Master Fee Schedule in effect between July 1, 2022, and December 31, 2022 Attachment 2 - Development Impact Fees Master Fee Schedule in effect between January 1, 2023, and June 30, 2023 ===== PAGE 4 ===== ### 1. DEVELOPMENT IMPACT FEE REPORT The California Mitigation Fee Act (Government Code Sections 66000 et seq.) mandates procedures for administration of impact fee programs, including collection and accounting, reporting, and refunds. Regarding reporting requirements, the Mitigation Fee Act requires annual reporting for each impact fee fund, and a separate five-year reporting process. This report meets the requirements described in 1.1 Annual Report, below. A combined Annual and Five-Year Report will be provided in future years when needed to meet required reporting timelines. ### 1.1 Annual Report Section 66006 (b) (1) requires that once each year, within 180 days of the close of the fiscal year, the local agency must make available to the public the following information for each separate account established to receive impact fee revenues: 1. A brief description of the type of fee in the account or fund; (report section 2) 2. The amount of the fee; (report section 2 and attachment) 3. The beginning and ending balance of the account or fund; (report section 3) 4. The amount of the fees collected and interest earned; (report section 3) 5. Identification of each public improvement on which fees were expended and the amount of the expenditures on each improvement, including the percentage of the cost of the public improvement that was funded with fees; (report section 4) 6. Identification of the approximate date by which the construction of a public improvement will commence, if the City determines sufficient funds have been collected to complete financing of an incomplete public improvement; An identification of each public improvement identified in a previous report and whether construction began on the approximate date noted in the previous report. For a project identified pursuant for which construction did not commence by the approximate date provided in the previous report, the reason for the delay and a revised approximate date that the local agency will commence construction. (report section 4) 7. A description of each inter-fund transfer or loan made from the account or fund, including interest rates, repayment dates, and a description of the improvement on which the transfer or loan will be expended; (report section 5) 8. The amount of any refunds or allocations made pursuant to Section 66001, paragraphs (e) and (f). (report section 6) The annual report must be reviewed by the City Council at its next regularly scheduled public meeting, but not less than 15 days after the statements are made public, per Section 66006 (b) (2). City of Victorville Annual Development Impact Fee Report Prepared by NBS ===== PAGE 5 ===== Section 66013(d) has similar requirements for capacity charges in that, within 180 days after the close of each fiscal year, the local agency must make available to the public the following information: 1. A description of the charges deposited in the fund; (report section 2) 2. The beginning and ending balance of the fund and the interest earned from investment of moneys in the fund; (report section 3) 3. The amount of charges collected in that fiscal year; (report section 3) 4. An identification of: a. Each public improvement on which charges were expended and the amount of expenditure for each improvement, including the percentage of the total cost of the public improvement that was funded with those charges if more than one source of funding was used; (report section 4) b. Each public improvement on which charges were expended that was completed during that fiscal year; (report section 4) c. Each public improvement that is anticipated to be undertaken in the following fiscal year; (report section 4) 5. A description of each interfund transfer or loan made from the capital facilities fund, including the public improvement on which the transferred or loaned charges are or will be expended and, in the case of an interfund loan, the date on which the loan will be repaid and the rate of interest that the fund will receive on the loan. (report section 6) ### 1.2 Five-Year Report Prior to 1996, The Mitigation Fee Act required that a local agency collecting impact fees was required to expend or commit impact fee revenue within five years or make findings to justify a continued need for the money. Otherwise, those funds had to be refunded. SB 1693, adopted in 1996 as an amendment to the Mitigation Fee Act, changed that requirement in material ways. Now, Section 66001 (d) requires that, for the fifth fiscal year following the first deposit of any impact fee revenue into an account or fund as required by Section 66006 (b), and every five years thereafter, the local agency shall make all of the following findings for any fee revenue that remains unexpended, whether committed or uncommitted: 1. Identify the purpose to which the fee will be put; 2. Demonstrate the reasonable relationship between the fee and the purpose for which it is charged; 3. Identify all sources and amounts of funding anticipated to complete financing of incomplete improvements for which impact fees are to be used; ===== PAGE 6 ===== 4. Designate the approximate dates on which the funding necessary to complete financing of those improvements will be deposited into the appropriate account or fund. Those findings are to be made in conjunction with the annual reports discussed above. If such findings are not made as required by Section 66001, the local agency could be required to refund the moneys in the account or fund, per Section 66001 (d). Once the agency determines that sufficient funds have been collected to complete financing on incomplete improvements for which impact fee revenue is to be used, it must, within 180 days of that determination, identify an approximate date by which construction of the public improvement will be commenced (Section 66001 (e)). If the agency fails to comply with that requirement, it must refund impact fee revenue in the account according to procedures specified in Section 66001 (d). ===== PAGE 7 ===== ### 2. CURRENT IMPACT FEES & CAPACITY CHARGES Development impact fees (DIFs) in the City of Victorville are one-time charges levied on new development in Victorville to fund various infrastructure, facilities, vehicles, and equipment. The basis for these impact fees is presented in the several development impact fee study reports: Development Impact Fee Justification Study, Regional Drainage Facilities, (Drainage DIF Report), competed by DTA on May 9, 2022 and adopted by City Council June 7, 2022 Development Impact Fee Study, Final Report (NBS DIF Report) completed by NBS on May 6, 2022. Fees documented in the DIF Report were adopted by City Council on June 7, 2022 and were effective during the majority of Fiscal Year 2022-23. ### 2.1 Types of Impact Fees, Capacity Charges and Associated Funds The fees documented in the body of this Annual Development Impact Fee Report (Report) include the following fees listed below. The revenue and expenditures for each fee type is tracked by the City in a separate fund.
Table 1. Impact Fees and Impact Fee Funds
Fund No.Facility Fee NamePurpose and Use of the Fee
350Public BuildingsThe purpose of the Public Buildings Impact Fee is to mitigate the impact of new development on the need for public buildings and general government vehicles and equipment in Victorville. Impact fees will be used to provide additional public buildings, vehicles, and equipment to mitigate the impact of new development on the need for those facilities in the City.
351Fire SafetyThe purpose of Fire Protection Facilities Impact Fee is to mitigate the impact of new development on the need for fire facilities provided by the City of Victorville. Impact fees will be used to provide additional fire facilities to mitigate the impact of new development on the need for those facilities in the City.
===== PAGE 8 =====
Fund No.Facility Fee NamePurpose and Use of the Fee
352RoadsThe purpose of the Road Improvements Impact Fee is to mitigate the impact of new development on the need for road, bridge, interchange and traffic signal improvements in Victorville. Impact fees calculated in this chapter will be used to provide additional road, bridge, interchange and traffic signal improvements to mitigate the impact of new development on the need for those facilities in the City. The list of eligible improvement projects for roadway projects is included in Table 9.1 of the DIF Report. Note funds 355 and 356, are reported as combined with Fund 352. The purpose of the Fund 355 Nisqualli impact fee is to mitigate the impact of new development within an area served by the I-15 / Nisqualli Rd. / La Mesa Rd. Interchange. Impact fees have been and will be used to pay for the interchange improvements. The purpose of the Fund 356 Goodwill impact fee is to mitigate the impact of new development within an area served by the Goodwill (I-15 / Roy Rogers) Interchange. Impact fees have been and will be used to pay for the interchange improvements.
353PoliceThe purpose of Police Facilities Impact Fee is to mitigate the impact of new development on the need for police facilities in Victorville. Impact fee funding will be used to provide additional police facilities to mitigate the impact of new development on the need for those facilities in the City.
354Parks and RecreationThe purpose of the Parks and Recreation Facilities Impact Fee is to mitigate the impact of new development on the need for parks and recreation facilities in Victorville. Fee revenues will be used to fund additional parks and recreation facilities to mitigate the impacts of new development in the City.
357Storm DrainageThe purpose of the Storm Drainage Impact Fee is to ensure that all new development pays its fair share of cost of new infrastructure. Impact fee funds will finance new development's share of future drainage facilities to meet the demands of new development in the City through 2050. The list of eligible improvement projects for storm drainage impact fee funding is included in Appendix A of the Drainage DIF Report.
===== PAGE 9 =====
Fund No.Facility Fee NamePurpose and Use of the Fee
414 and 415Water System ImprovementsWater Capacity Charges are one-time charges to new development connecting to the City of Victorville/Victorville Water District's water system. System improvements include water distribution pipelines, additional operational and emergency reservoir storage and additional ground water wells. The list of eligible improvement projects for water capacity fee funding is included in Tables 8.1 and 8.4 of the NBS DIF Report. A component of the Water Capacity Charges also includes the cost of acquiring rights to additional ground water or alternative sources of supply. The water rights component of the overall water system capacity charge will be used to acquire additional ground water rights, or to purchase permanent supplemental water if ground water rights are not available. Revenues may also be used for projects and technology that would provide permanent supplemental water to the basin in lieu of ground water rights.
425SewerThe purpose of the sewer capacity charge is to fund the new connections attributable to the impact from new development. Sewer Capacity Charges are one-time charges to new development or existing development first connecting to the City of Victorville's sewer system. The list of eligible planned capital projects funded by sewer capacity charges is shown in the NBS DIF Report, Appendix D, Figure 6.
### 2.2 Current Fee Schedule During Fiscal Year 2022-23, the Victorville City Council adopted Resolutions 22-055 and VWD 22-008 on June 7, 2022, which included a Development Impact Fee Study and updated Master Fee Schedule, and a phased in approach to update fees to the full amount identified in the study. Prior to January 1, 2023, the City's impact fees that were established in the "Development Impact Fee 2006 Update Study" (2006 Study) report, completed by AGAJANIAN & Associates remained in effect. • Attachment 1 to this report includes Victorville's Development Impact Fee Schedule in effect between July 1, 2022, and December 31, 2022 • Attachment 2 to this report includes Victorville's Development Impact Fee Schedule in effect between January 1, 2023, and June 30, 2023 ===== PAGE 10 ===== ### 3. FINANCIAL SUMMARY REPORT The following financial summary provides an annual statement of revenues, and changes in fund balance for each impact fee fund, for the Fiscal Year End June 30, 2023. Figures shown in the table below are unaudited as of the date of this report.
Table 2. Financial Summary Fiscal Year 2023
Fund No.350 Public Buildings351 Fire Safety352 Roads353 Police354 Parks and Recreation357 Storm Drain414, 415 Water416 Sewer
DescriptionBuildingsFire SafetyRoadsPoliceRecreationStorm DrainWaterSewer
REVENUES
Fees787,252161,1723,238,50879,0712,188,256189,6951,974,0752,097,200
Interest6,58210,225122,40521,828377,94455,118188,75443,005
Total Revenues793,833171,3973,360,912100,8992,566,200244,8132,162,8292,140,205
Fund Balance, Beginning of the Year1(17,782,090)270,06914,657,6451,738,05316,246,3035,024,28219,874,345-
Fund Balance, End of the Year1(17,381,518)440,34313,286,1881,838,95218,904,0305,269,09421,343,3332,140,205
3 Beginning & Ending Fund Balance per financial reports provided by the City's Finance Department. ===== PAGE 11 ===== ### 4. PUBLIC IMPROVEMENTS This section of the Annual Report identifies each public improvement on which fees were expended and the amount of the expenditures on each improvement, including the percentage of the cost of the public improvement that was funded with fees.
Table 3. Public Improvements Fiscal Year 2023
FundFund NameProj. #Project NameProject StartProject FinishProject PhaseTotal Project FundingDevelopment Impact Fees
Total Impact Fee Funded Amount% Impact Fee FundedTotal Prior Year Impact Fee ExpendituresFY 2023 Impact Fee ExpendituresImpact Fee Funding Remaining
352Road60005NISQ/I15 INTERCHANGE-ST CONSTOngoingOngoingActive$ 48,860,904$ 22,762,80347%$ 22,762,803$ 22,756$ (22,756)
352Road30013Green Tree Blvd ExtensionFY 2021/22FY 2022/23Completed$ 80,550,764$ 19,005,39324%$ 9,910,288$ 5,401,951$ 3,693,154
352Road60014Bear Valley Road Bridge over BNSF RailwayFY 2021FY 2024Active$ 23,932,167$ 4,703,14020%$ 753,780$ 1,744,228$ 2,205,132
352RoadNALocal Traffic Signal ImprovementsOngoingOngoingActive$ 18,414,000$ 18,414,000100%-$ 15,808$ 18,398,192
354Parks81033Brentwood RestroomFY 2022/23FY 2022/23Completed$ 350,000$ 350,000100%-$ 242,712$ 107,288
354Parks81034Eagle Ranch RestroomFY 2022/23FY 2024/25Active$ 350,000$ 350,000100%-$ 917$ 349,083
354Parks80058Hook Track LightingFY 2022/23FY 2024/25Active$ 530,000$ 530,000100%-$ 85,560$ 444,440
354Parks81005New Shade StructureFY 2022/23FY 2022/23Completed$ 150,000$ 150,000100%-$ 135,996$ 14,004
414Water74419Project Area 31- Pipeline ReplacementFY 2021/22FY 2022/23Completed$ 1,550,000$ 699,84845%$ 293$ 693,841$ 5,715
TOTAL$ 174,687,835$ 66,965,184$ 33,427,163$ 8,343,769$ 25,194,252
Government Code Section 66006 (b)(1)(F)(i) also requires Identification of the approximate date by which the construction of a public improvement will commence, if the City determines sufficient funds have been collected to complete financing of an incomplete public improvement. The City has identified public improvement projects that have sufficient impact fee funds available to complete, including approximate dates (fiscal year) of construction, as follows: ## Fund: 354 Parks Project: 81032 Sports Complex Feasibility Study ○ Project Start: Fiscal Year 2022-23 ○ Project Finish: Fiscal Year 2024-25 ○ Total Project Funding: $100,000, 100% DIF City of Victorville Annual Development Impact Fee Report Prepared by NBS ===== PAGE 12 ===== Project: 81004 Dog Park ○ Project Start: Fiscal Year 2022-23 ○ Project Finish: Fiscal Year 2024-25 ○ Total Project Funding: $150,000, 100% DIF Project: 81006 New Rectangular Fields ○ Project Start: Fiscal Year 2022-23 ○ Project Finish: Fiscal Year 2024-25 ○ Total Project Funding: $350,000, 100% DIF Project: 81008 New Walking Path ○ Project Start Date: Fiscal Year 2024-25 ○ Project Finish: Fiscal Year 2025-26 ○ Total Project Funding: $150,000, 100% DIF Government Section 66013(d) has similar requirements for water and wastewater capacity charges to identify each public improvement that is anticipated to be undertaken in the following fiscal year. There will be one future project funded from Fund 414 - Water Capacity Charges in the amount of $4.3 Million for 74338 Pipeline - Area 28 - MWA Turnout #5, to be completed by December 2025, this project will be added during the mid-year Capital Improvement Project budgeting process for Fiscal Year 2024. ===== PAGE 13 ===== ### 5. INTERFUND LOANS The Mitigation Fee Act requires a description of each inter-fund transfer or loan made from the account or fund, including interest rates, repayment dates, and a description of the improvement on which the transfer or loan will be expended. There were no new interfund transfers or loans made between impact fee funds in Fiscal Year 2022-23.
Table 4. Fiscal Year 2023 Interfund Loan Statuses
Date of LoanMaturity DatePurpose of LoanOriginal AdvanceLenderBorrowerBalance 06/30/2023Interest Rate1
06/30/1106/30/26City Hall Expansion Project #980057,725,000352 Roads350 Public Buildings7,030,2261.37%
06/30/1106/30/26City Hall Expansion Project #980051,150,000353 Public Safety350 Public Buildings1,046,5711.37%
06/30/1106/30/26City Hall Expansion Project #980054,375,000354 Recreation350 Public Buildings3,981,5201.37%
06/30/1106/30/26City Hall Expansion Project #98005570,000352 Roads350 Public Buildings518,7351.37%
06/30/1106/30/26City Hall Expansion Project #98005920,000352 Roads350 Public Buildings837,2571.37%
06/30/1106/30/26City Hall Expansion Project #980053,675,000357 Storm Drain DIF350 Public Buildings3,344,4771.37%
06/30/1106/30/26City Hall Expansion Project #98005280,000358 Street Lighting350 Public Buildings254,8171.37%
06/30/1106/30/26City Hall Expansion Project #98005395,000359 Fire Hydrant350 Public Buildings359,4741.37%
===== PAGE 14 ===== ### 6. REFUNDS The refunding requirements for the Mitigation Fee Act are summarized as follows: Refunds under the Mitigation Fee Act: If the City determines that sufficient funds have been collected to complete financing on incomplete improvements for which impact fee revenue is to be used, it must, within 180 days of that determination, identify an approximate date by which construction of the public improvement will be commenced (Government Code Section 66001 (e)). If the agency fails to comply with that requirement, it must refund impact fee revenue in the account according to procedures specified in Section 66001 (d). As discussed in Section 4 of this report, throughout the Fiscal Year 2022-2023 the City has made progress on several active public improvement projects that are funded by impact fees. Also, through the 2023-24 budgeting process, the City made a determination regarding sufficient funds collected to complete several improvements and a construction schedule has been identified. Therefore, no refunds were made or required. Disclaimer: In preparing this report and any analysis and findings included herein, NBS has relied on several principal assumptions and considerations regarding financial matters, conditions and events that occurred or may occur in the future. This information and assumptions, including the City's budgets, financial reports, capital project data, and other information were provided by sources we believe to be reliable; however, NBS has not independently verified such information and assumptions. While we believe NBS' use of such information and assumptions is reasonable for the purpose of this report, some assumptions will invariably not materialize as stated herein and may vary due to unanticipated events and circumstances. ===== PAGE 15 ===== City of Victorville Development Impact Fees Master Fee Schedule in effect between July 1, 2022, and December 31, 2022 ===== PAGE 16 ===== # BUILDING FEES – RESIDENTIAL In order to assist you in estimating the permit fees for your project, several tables and charts have been compiled and are included in this package. By following the steps listed below, a reasonable estimate may be made. THE FOLLOWING BUILDING VALUATION DATA REPRESENTS AVERAGE COSTS FOR MOST BUILDINGS. THIS CHART IS ADJUSTED ANNUALLY AS RELEASED BY THE INTERNATIONAL CODE COUNCIL AND USED SOLELY FOR THE DETERMINATION OF PERMIT FEES. STEP 1 – Find the type of project below and determine the value per square foot. Multiply this figure by the total square footage of the project. This will be the project valuation. Typical single family dwellings are Type 5B construction.
Construction GroupConstruction Type
1A1B2A2B3A3B4 - HT5A5B
R-2 Residential, multi-family$165.05$158.44$152.98$145.27$132.00$127.61$145.37$115.18$110.68
R-3 Residential, one- and two-family$154.04$149.85$145.98$142.32$137.11$133.50$139.93$128.29$120.75
R-4 Residential, care/assist. living facility$194.98$188.36$182.90$175.20$161.40$157.01$175.29$144.58$140.08
U Garages$83.66$79.00$74.06$70.37$63.47$59.32$67.24$50.19$47.80
All Occupancies - Sprinklers$2.40$2.40$2.40$2.40$2.40$2.40$2.40$2.40$2.40
All Occupancies - Porch / Patio$20.20$20.20$20.20$20.20$20.20$20.20$20.20$20.20$20.20
STEP 2 – Find the valuation of the project on page 2, and then add the fees for plan review and construction permit. Determine the Strong Motion Implementation Program (SMIP) fee and add to the total, as follows: < $5,000 valuation = .50 SMIP; > $5,000 valuation x .00013 (.00028 if over 3 stories) = SMIP STEP 3 – Review page 3 for miscellaneous plumbing, electrical, and mechanical fees. Note that a separate permit is required for each independent structure, even though they may be located on the same parcel. ## Additional Fees Development Impact Fees - $11,327.00 per single-family dwelling unit, and $7,639.00 per multi-family dwelling unit. This fee is used for parks, roads, and public safety capital improvement costs. Following is a break-down of these fees:
Development Impact Fee TypeSingle Family Cost per Dwelling UnitMulti Family Cost per Dwelling Unit
Facilities$1,334.35$716.95
Fire$328.81$232.13
Parks$5,045.87$3,847.12
Police$139.07$98.18
Roads$4,469.90$2,744.62
Victor Valley Water Reclamation Authority (VVWRA) or Industrial Waste Water Treatment Plant (IWWTP) Fees – VVWRA and IWWTP fees are used for the expansion of sewage treatment facilities, and can be computed by completing the form on page 4. Sewer Capacity Fees – Fees are generally figured at a minimum of $350.00 per house connection. Water Connection Fees – Please contact the Engineering Department for questions regarding costs. Other Special Assessments – Depending on the location of the project, there may also be special assessment fees to cover storm drains, bridges, road widening, street lighting, and fire hydrant installation. Please contact the Development Department for more information regarding special assessment districts. School District Fees – A Certificate of Compliance from the school district must be submitted to the Development Department. Technology Fee – Multiply the Plan Review, Building Permit, Mechanical Permit, Electrical Permit, and Plumbing Permit fees by 4.8% (.048) to determine the Technology Fee. Green Building Fee – Senate Bill 1473 which provides for the creation of the Building Standards Administration Special Revolving Fund.
Permit ValuationFee
$1 – 25,000$1
$25,001 – 50,000$2
$50,001 – 75,000$3
$75,001 – 100,000$4
Every $25,000 or fraction thereof above $100,000Add $1
===== PAGE 17 ===== # City of Victorville Development Department Planning ♦ Building ♦ Code Enforcement ♦ Business License ♦ Animal Control BUILDING FEES – RESIDENTIAL Project Valuation
Total ValuationPlan ReviewPermitTotal ValuationPlan ReviewPermitTotal ValuationPlan ReviewPermit
$1.00 - $2,000.00$29.25$45.00$270,001.00 - $275,000.00$813.80$1,252.00$590,001.00 - $600,000.00$1,520.68$2,339.50
$2,001.00 - $5,000.00$46.80$72.00$275,001.00 - $280,000.00$825.18$1,269.50$600,001.00 - $610,000.00$1,540.18$2,369.50
$5,001.00 - $10,000.00$76.05$117.00$280,001.00 - $285,000.00$836.55$1,287.00$610,001.00 - $620,000.00$1,559.68$2,399.50
$10,001.00 - $15,000.00$105.30$162.00$285,001.00 - $290,000.00$847.93$1,304.50$620,001.00 - $630,000.00$1,579.18$2,429.50
$15,001.00 - $20,000.00$134.55$207.00$290,001.00 - $295,000.00$859.30$1,322.00$630,001.00 - $640,000.00$1,598.68$2,459.50
$20,001.00 - $25,000.00$163.80$252.00$295,001.00 - $300,000.00$870.68$1,339.50$640,001.00 - $650,000.00$1,618.18$2,489.50
$25,001.00 - $30,000.00$184.93$284.50$300,001.00 - $305,000.00$882.05$1,357.00$650,001.00 - $660,000.00$1,637.68$2,519.50
$30,001.00 - $35,000.00$206.05$317.00$305,001.00 - $310,000.00$893.43$1,374.50$660,001.00 - $670,000.00$1,657.18$2,549.50
$35,001.00 - $40,000.00$227.18$349.50$310,001.00 - $315,000.00$904.80$1,392.00$670,001.00 - $680,000.00$1,676.68$2,579.50
$40,001.00 - $45,000.00$248.30$382.00$315,001.00 - $320,000.00$916.18$1,409.50$680,001.00 - $690,000.00$1,696.18$2,609.50
$45,001.00 - $50,000.00$269.43$414.50$320,001.00 - $325,000.00$927.55$1,427.00$690,001.00 - $700,000.00$1,715.68$2,639.50
$50,001.00 - $55,000.00$284.05$437.00$325,001.00 - $330,000.00$938.93$1,444.50$700,001.00 - $710,000.00$1,735.18$2,669.50
$55,001.00 - $60,000.00$298.68$459.50$330,001.00 - $335,000.00$950.30$1,462.00$710,001.00 - $720,000.00$1,754.68$2,699.50
$60,001.00 - $65,000.00$313.30$482.00$335,001.00 - $340,000.00$961.68$1,479.50$720,001.00 - $730,000.00$1,774.18$2,729.50
$65,001.00 - $70,000.00$327.93$504.50$340,001.00 - $345,000.00$973.05$1,497.00$730,001.00 - $740,000.00$1,793.68$2,759.50
$70,001.00 - $75,000.00$342.55$527.00$345,001.00 - $350,000.00$984.43$1,514.50$741,001.00 - $750,000.00$1,813.18$2,789.50
$75,001.00 - $80,000.00$357.18$549.50$350,001.00 - $355,000.00$995.80$1,532.00$750,001.00 - $760,000.00$1,832.68$2,819.50
$80,001.00 - $85,000.00$371.80$572.00$355,001.00 - $360,000.00$1,007.18$1,549.50$760,001.00 - $770,000.00$1,852.18$2,849.50
$85,001.00 - $90,000.00$386.43$594.50$360,001.00 - $365,000.00$1,018.55$1,567.00$770,001.00 - $780,000.00$1,871.68$2,879.50
$90,001.00 - $95,000.00$401.05$617.00$365,001.00 - $370,000.00$1,029.93$1,584.50$780,001.00 - $790,000.00$1,891.18$2,909.50
$95,001.00 - $100,000.00$415.68$639.50$370,001.00 - $375,000.00$1,041.30$1,602.00$790,001.00 - $800,000.00$1,910.68$2,939.50
$100,001.00 - $105,000.00$427.05$657.00$375,001.00 - $380,000.00$1,052.68$1,619.50$800,001.00 - $810,000.00$1,930.18$2,969.50
$105,001.00 - $110,000.00$438.43$674.50$380,001.00 - $385,000.00$1,064.05$1,637.00$810,001.00 - $820,000.00$1,949.68$2,999.50
$110,001.00 - $115,000.00$449.80$692.00$385,001.00 - $390,000.00$1,075.43$1,654.50$820,001.00 - $830,000.00$1,969.18$3,029.50
$115,001.00 - $120,000.00$461.18$709.50$390,001.00 - $395,000.00$1,086.80$1,672.00$830,001.00 - $840,000.00$1,988.68$3,059.50
$120,001.00 - $125,000.00$472.55$727.00$395,001.00 - $400,000.00$1,098.18$1,689.50$840,001.00 - $850,000.00$2,008.18$3,089.50
$125,001.00 - $130,000.00$483.93$744.50$400,001.00 - $405,000.00$1,109.55$1,707.00$850,001.00 - $860,000.00$2,027.68$3,119.50
$130,001.00 - $135,000.00$495.30$762.00$405,001.00 - $410,000.00$1,120.93$1,724.50$860,001.00 - $870,000.00$2,047.18$3,149.50
$135,001.00 - $140,000.00$506.68$779.50$410,001.00 - $415,000.00$1,132.30$1,742.00$870,001.00 - $880,000.00$2,066.68$3,179.50
$140,001.00 - $145,000.00$518.05$797.00$415,001.00 - $420,000.00$1,143.68$1,759.50$880,001.00 - $890,000.00$2,086.18$3,209.50
$145,001.00 - $150,000.00$529.43$814.50$420,001.00 - $425,000.00$1,155.05$1,777.00$890,001.00 - $900,000.00$2,105.68$3,239.50
$150,001.00 - $155,000.00$540.80$832.00$425,001.00 - $430,000.00$1,166.43$1,794.50$900,001.00 - $910,000.00$2,125.18$3,269.50
$155,001.00 - $160,000.00$
*BUILDINGS PROVIDED WITH AUTOMATIC SPRINKLER SYSTEMS WILL BE GIVEN AN ADDITIONAL VALUATION OF $2.40 PER SQUARE FOOT.* ===== PAGE 18 ===== Plumbing, Electrical, Mechanical Fees
Note: A one-time fee of $20.00 will be added to Plumbing, Electrical and Mechanical Permits.
Plumbing Fees
Bathtub$7.00Septic System$40.00
Clothes Washer$7.00Sewer System$15.00
Dishwasher$7.00Shower$7.00
Drinking Fountain$7.00Sink$7.00
Floor Drain$7.00Swimming Pool / Spa$7.00
Floor Sink$7.00Toilet$7.00
Gas System$5.00Urinal$7.00
Hose Bib$5.00Waste Interceptor$7.00
Irrigation System$7.00Water Closet w/ Flushometer$7.00
Lavatory$7.00Water Heater$7.00
Lawn Sprinkler$7.00Water System$7.00
Electrical FeesMechanical Fees
Construction Power$15.00Boiler, Hot Water$14.70
Fixtures / Receptacles$2.00Boiler, Steam$14.70
Garage / Carport Square Feet$0.015Evaporative Cooler$10.65
Light Standards$10.00Exhaust Duct$10.65
Motors < 10 HP$5.00FAU < 100 MBTU$14.80
Motors 10-50 HP$12.30FAU > 100 MBTU$14.80
Motors > 50$49.00Generator$14.65
Patio / Porch Square Feet$0.015HVAC < 8$14.80
Residential Square Feet$0.035HVAC > 8$18.20
Service < 200 AMP$30.50Mechanical Fireplace$10.65
Services > 200 < 1000 AMP$62.50Vent System$7.25
Service > 1000 AMP$124.30
Subpanel$23.50
===== PAGE 19 ===== Victor Valley Water Reclamation Authority Fee (VVWRA) or Industrial Waste Water Treatment Plant Fee (IWWTP) Note: The fee assessed is based on the location of the project. Please contact the Development Department for more information.
Type of Unit
Single Family ResidenceCondo☐
Multi-Family UnitsMobile Home☐
Number of Units:Other:
FixturesNo. of FixturesNo. of Equivalent Fixture UnitsTotal No. of Fixture Units
Bar Sink1
Bathtub (With or Without Shower)2
Dishwasher2
Floor Drain2
Laundry Tub or Clotheswasher (Each Pair Faucets)2
Lavatory (Bathroom) – Dual Basins2
Lavatory (Bathroom) – Single Basin1
R.V. Dump Station4
Shower Stall (Each Set of Faucets)2
Sink (Kitchen/Utility, Includes Garbage Disposal)2
Water Closet (Flush Tank)4
Total Number of Fixture Units: ________ x $200.00 (VVWRA) OR x $187.50 (IWWTP) =$
===== PAGE 20 ===== In order to assist you in estimating the permit fees for your project, several tables and charts have been compiled and are included in this package. By following the steps listed below, a reasonable estimate may be made. STEP 1 – Review page 2 for type of project and determine the value per square foot. Multiply this figure by the total square footage of the project. STEP 2 – Find the valuation of the project on page 3, and then add the fees for plan review and construction permit. STEP 3 – Review page 4 for miscellaneous plumbing, electrical, and mechanical fees. Note that a separate permit is required for each independent structure, even though they may be located on the same parcel. ## Additional Permit Fees Development Impact Fee – $9.28 per square foot for commercial projects, $3.44 per square foot for industrial projects and $1.87 per square foot for industrial high cube projects. This fee is used for roads and public safety capital improvement costs. Following is a break-down of these fees:
Development Impact Fee TypeCommercial Cost per Square FootIndustrial Cost per Square FootIndustrial High Cube Cost per Square Foot
Facilities$1.34$0.44$0.25
Fire$0.17$0.01$0.02
Police$0.17$0.01$0.02
Roads$7.60$2.98$1.58
VWWRA (Victor Valley Water Reclamation Authority) or IWWTP (Industrial Waste Water Treatment Plant) – VWWRA and IWWTP fees are used for the expansion of sewage treatment facilities, and can be computed by completing the form on page 5. The fee assessed is based on the location of the project. Please contact the Development Department for more information. Sewer Capacity Fees – Commercial projects are figured on an equivalent dwelling unit basis by using the following calculations: Total number of fixture units (using form on page 5), divided by 20, and multiplied by $350.00. Other Special Assessments – Depending on the location of the project, there may also be special assessment fees to cover storm drains, bridges, road widening, street lighting, and fire hydrant installation. Please contact the Development Department for more information regarding special assessment districts. School District Fees – A Certificate of Compliance from the school district must be submitted to the Development Department. Strong Motion Implementation Program (SMIP) Fee – Projects with a valuation less than $2,381 will receive a SMIP fee of .50. Projects with a valuation greater than $2,381 should multiply the valuation by .00028 to determine SMIP. Technology Fee – Multiply the Plan Review, Building Permit, Mechanical Permit, Electrical Permit, and Plumbing Permit fees by 4.8% (.048) to determine the Technology Fee. Green Building Fee – Senate Bill 1473 which provides for the creation of the Building Standards Administration Special Revolving Fund.
Permit ValuationFee
$1 – 25,000$1
$25,001 – 50,000$2
$50,001 – 75,000$3
$75,001 – 100,000$4
Every $25,000 or fraction thereof above $100,000Add $1
THESE FEES ARE FOR ESTIMATION PURPOSES ONLY. ALL PLANS MUST BE SUBMITTED AND APPROVED BEFORE OFFICIAL FEES CAN BE ASSESSED. ===== PAGE 21 ===== THE FOLLOWING BUILDING VALUATION DATA REPRESENTS AVERAGE COSTS FOR MOST NEW CONSTRUCTION BUILDINGS. THIS CHART IS ADJUSTED ANNUALLY AS RELEASED BY THE INTERNATIONAL CODE COUNCIL AND USED SOLELY FOR THE DETERMINATION OF PERMIT FEES. TENANT IMPROVEMENTS WILL BE VALUATED AT 20% OF THESE FEES.
Construction GroupConstruction Type
1A1B2A2B3A3B4 – HT5A5B
A-1 Assembly, theaters, with stage$244.21$236.18$230.55$221.01$207.82$201.82$214.02$189.83$182.71
A-1 Assembly, theaters, w/out stage$223.45$215.42$209.80$200.25$187.31$181.32$193.26$169.33$162.21
A-2 Assembly, nightclubs$190.08$184.73$180.34$172.99$163.33$158.82$166.99$147.83$142.92
A-2 Assembly, restaurants, bars, banquet halls$189.08$183.73$178.34$171.99$161.33$157.82$165.99$145.83$141.92
A-3 Assembly, churches$224.47$216.44$210.82$201.27$189.73$183.73$194.28$171.74$164.62
A-3 Assembly, general, community halls, libraries, museums$188.77$180.74$174.11$165.57$151.59$146.63$158.58$133.64$127.52
A-4 Assembly, arenas$222.45$214.42$207.80$199.25$185.31$180.32$192.26$167.33$161.21
B Business$195.88$188.76$182.90$173.98$159.08$153.13$167.31$139.76$133.67
E Educational$207.44$200.32$195.11$186.22$173.62$164.85$179.83$151.63$147.30
F-1 Factory and industrial, moderate hazard$115.30$109.99$103.87$99.84$89.72$85.56$95.69$73.79$69.57
F-2 Factory and industrial, low hazard$114.30$108.99$103.87$98.84$89.72$84.56$94.69$73.79$68.57
H-1 High Hazard, explosives$107.85$102.54$97.43$92.40$83.50$78.33$88.25$67.57$0.00
H-2, 3, 4 High Hazard$107.85$102.54$97.43$92.40$83.50$78.33$88.25$67.57$62.34
H-5 HPM$195.88$188.76$182.90$173.98$159.08$153.13$167.31$139.76$133.67
I-1 Institutional, supervised environment$194.98$188.36$182.90$175.20$161.40$157.01$175.29$144.58$140.08
I-2 Institutional, hospitals$327.69$320.57$314.72$305.80$289.87$0.00$299.12$270.56$0.00
I-2 Institutional, nursing homes$227.45$220.33$214.47$205.56$191.65$0.00$198.88$172.34$0.00
I-3 Institutional, restrained$222.66$215.54$209.69$200.77$187.11$180.16$194.09$167.80$159.71
I-4 Institutional, day care facilities$194.98$188.36$182.90$175.20$161.40$157.01$175.29$144.58$140.08
M Mercantile$141.54$136.19$130.80$124.45$114.24$110.73$118.45$98.74$94.83
R-1 Residential, hotels$196.81$190.20$184.74$177.03$162.97$158.58$177.13$146.15$141.65
S-1 Storage, moderate hazard$106.85$101.54$95.43$91.40$81.50$77.33$87.25$65.57$61.34
S-2 Storage, low hazard$105.85$100.54$95.43$90.40$81.50$76.33$86.25$65.57$60.34
*BUILDINGS PROVIDED WITH AUTOMATIC SPRINKLER SYSTEMS WILL BE GIVEN AN ADDITIONAL VALUATION OF $2.40 PER SQUARE FOOT.* ===== PAGE 22 ===== Development Department Planning ♦ Building ♦ Code Enforcement ♦ Business License ♦ Animal Control BUILDING FEES – COMMERCIAL Project Valuation
Total ValuationPlan ReviewPermitTotal ValuationPlan ReviewPermitTotal ValuationPlan ReviewPermit
$1.00 - $2,000.00$29.25$45.00$270,001.00 - $275,000.00$813.80$1,252.00$590,001.00 - $600,000.00$1,520.68$2,339.50
$2,001.00 - $5,000.00$46.80$72.00$275,001.00 - $280,000.00$825.18$1,269.50$600,001.00 - $610,000.00$1,540.18$2,369.50
$5,001.00 - $10,000.00$76.05$117.00$280,001.00 - $285,000.00$836.55$1,287.00$610,001.00 - $620,000.00$1,559.68$2,399.50
$10,001.00 - $15,000.00$105.30$162.00$285,001.00 - $290,000.00$847.93$1,304.50$620,001.00 - $630,000.00$1,579.18$2,429.50
$15,001.00 - $20,000.00$134.55$207.00$290,001.00 - $295,000.00$859.30$1,322.00$630,001.00 - $640,000.00$1,598.68$2,459.50
$20,001.00 - $25,000.00$163.80$252.00$295,001.00 - $300,000.00$870.68$1,339.50$640,001.00 - $650,000.00$1,618.18$2,489.50
$25,001.00 - $30,000.00$184.93$284.50$300,001.00 - $305,000.00$882.05$1,357.00$650,001.00 - $660,000.00$1,637.68$2,519.50
$30,001.00 - $35,000.00$206.05$317.00$305,001.00 - $310,000.00$893.43$1,374.50$660,001.00 - $670,000.00$1,657.18$2,549.50
$35,001.00 - $40,000.00$227.18$349.50$310,001.00 - $315,000.00$904.80$1,392.00$670,001.00 - $680,000.00$1,676.68$2,579.50
$40,001.00 - $45,000.00$248.30$382.00$315,001.00 - $320,000.00$916.18$1,409.50$680,001.00 - $690,000.00$1,696.18$2,609.50
$45,001.00 - $50,000.00$269.43$414.50$320,001.00 - $325,000.00$927.55$1,427.00$690,001.00 - $700,000.00$1,715.68$2,639.50
$50,001.00 - $55,000.00$284.05$437.00$325,001.00 - $330,000.00$938.93$1,444.50$700,001.00 - $710,000.00$1,735.18$2,669.50
$55,001.00 - $60,000.00$298.68$459.50$330,001.00 - $335,000.00$950.30$1,462.00$710,001.00 - $720,000.00$1,754.68$2,699.50
$60,001.00 - $65,000.00$313.30$482.00$335,001.00 - $340,000.00$961.68$1,479.50$720,001.00 - $730,000.00$1,774.18$2,729.50
$65,001.00 - $70,000.00$327.93$504.50$340,001.00 - $345,000.00$973.05$1,497.00$730,001.00 - $740,000.00$1,793.68$2,759.50
$70,001.00 - $75,000.00$342.55$527.00$345,001.00 - $350,000.00$984.43$1,514.50$741,001.00 - $750,000.00$1,813.18$2,789.50
$75,001.00 - $80,000.00$357.18$549.50$350,001.00 - $355,000.00$995.80$1,532.00$750,001.00 - $760,000.00$1,832.68$2,819.50
$80,001.00 - $85,000.00$371.80$572.00$355,001.00 - $360,000.00$1,007.18$1,549.50$760,001.00 - $770,000.00$1,852.18$2,849.50
$85,001.00 - $90,000.00$386.43$594.50$360,001.00 - $365,000.00$1,018.55$1,567.00$770,001.00 - $780,000.00$1,871.68$2,879.50
$90,001.00 - $95,000.00$401.05$617.00$365,001.00 - $370,000.00$1,029.93$1,584.50$780,001.00 - $790,000.00$1,891.18$2,909.50
$95,001.00 - $100,000.00$415.68$639.50$370,001.00 - $375,000.00$1,041.30$1,602.00$790,001.00 - $800,000.00$1,910.68$2,939.50
$100,001.00 - $105,000.00$427.05$657.00$375,001.00 - $380,000.00$1,052.68$1,619.50$800,001.00 - $810,000.00$1,930.18$2,969.50
$105,001.00 - $110,000.00$438.43$674.50$380,001.00 - $385,000.00$1,064.05$1,637.00$810,001.00 - $820,000.00$1,949.68$2,999.50
$110,001.00 - $115,000.00$449.80$692.00$385,001.00 - $390,000.00$1,075.43$1,654.50$820,001.00 - $830,000.00$1,969.18$3,029.50
$115,001.00 - $120,000.00$461.18$709.50$390,001.00 - $395,000.00$1,086.80$1,672.00$830,001.00 - $840,000.00$1,988.68$3,059.50
$120,001.00 - $125,000.00$472.55$727.00$395,001.00 - $400,000.00$1,098.18$1,689.50$840,001.00 - $850,000.00$2,008.18$3,089.50
$125,001.00 - $130,000.00$483.93$744.50$400,001.00 - $405,000.00$1,109.55$1,707.00$850,001.00 - $860,000.00$2,027.68$3,119.50
$130,001.00 - $135,000.00$495.30$762.00$405,001.00 - $410,000.00$1,120.93$1,724.50$860,001.00 - $870,000.00$2,047.18$3,149.50
$135,001.00 - $140,000.00$506.68$779.50$410,001.00 - $415,000.00$1,132.30$1,742.00$870,001.00 - $880,000.00$2,066.68$3,179.50
$140,001.00 - $145,000.00$518.05$797.00$415,001.00 - $420,000.00$1,143.68$1,759.50$880,001.00 - $890,000.00$2,086.18$3,209.50
$145,001.00 - $150,000.00$529.43$814.50$420,001.00 - $425,000.00$1,155.05$1,777.00$890,001.00 - $900,000.00$2,105.68$3,239.50
$150,001.00 - $155,000.00$540.80$832.00$425,001.00 - $430,000.00$1,166.43$1,794.50$900,001.00 - $910,000.00$2,125.18$3,269.50
$155,001.00 - $160,000.00$
===== PAGE 23 ===== # Development Department Planning ♦ Building ♦ Code Enforcement ♦ Business License ♦ Animal Control BUILDING FEES – COMMERCIAL Plumbing, Electrical, Mechanical Fees
Note: A one-time fee of $20.00 will be added to Plumbing, Electrical and Mechanical Permits.
Plumbing Fees
Bathtub$7.00Septic System$40.00
Clothes Washer$7.00Sewer System$15.00
Dishwasher$7.00Shower$7.00
Drinking Fountain$7.00Sink$7.00
Floor Drain$7.00Swimming Pool / Spa$7.00
Floor Sink$7.00Toilet$7.00
Gas System$5.00Urinal$7.00
Hose Bib$5.00Waste Interceptor$7.00
Interceptor / Trap$7.00Water Closet w/ Flushometer$7.00
Irrigation System$7.00Water Heater$7.00
Lavatory$7.00Water System$7.00
Lawn Sprinkler$7.00
Electrical FeesMechanical Fees
Commercial Square Feet$0.015Boiler, Hot Water$14.70
Construction Power$15.00Boiler, Steam$14.70
Fixtures / Receptacles$2.00Evaporative Cooler$10.65
Garage / Carport Square Feet$0.015Exhaust Duct$10.65
Light Standards$10.00FAU < 100 MBTU$14.80
Motors < 10 HP$5.00FAU > 100 MBTU$14.80
Motors 10-50 HP$12.30Generator$14.65
Motors > 50$49.00HVAC < 8$14.80
Patio / Porch Square Feet$0.015HVAC > 8$18.20
Residential Square Feet$0.035Mechanical Fireplace$10.65
Service < 200 AMP$30.50Vent System$7.25
Services > 200 < 1000 AMP$62.50
Service > 1000 AMP$124.30
Subpanel$23.50
===== PAGE 24 ===== # BUILDING FEES – COMMERCIAL VVWRA (Victor Valley Water Reclamation Authority) or IWWTP (Industrial Waste Water Treatment Plant) Note: The fee assessed is based on the location of the project. Please contact the Development Department for more information.
Type of Unit
CommercialIndustrialHotel / MotelOther:
FixturesNo. of Fixturesx No. of Equivalent Fixture UnitsTotal No. of Fixture Units
Bar Sink2
Bathtub (With or Without Shower)4
Dental Unit or Cuspidor1
Dishwasher4
Drinking Fountain (Each Head)1
Floor Drain4
Floor Drain (For Emergency Overflows)1
Laundry Tub or Clotheswasher (Each Pair Faucets)4
Lavatory (Bathroom) - Dual Basins4
Lavatory (Bathroom) - Single Basin2
Lavatory (Dental)1
R.V. Dump Station20
Recreational Vehicle Spaces8
Shower (Each Set of Faucets)4
Sink (Flushing Rim, Clinic)10
Sink (Kitchen/Utility)4
Sink (Wash Up, Circular Spray)4
Sink (Wash Up, Each Set Faucets)3
Urinal (Wall)5
Water Closet (Flush Tank) - Home Style6
Water Closet (Flushometer Automatic Valve)10
Total Number of Fixture Units:x $200.00 (VVWRA) OR x $187.50 (IWWTP) Subtotal$
Sewage Facility Fees
VWWRA AmountIWWTP Amount
1. Prison$146.52 / bed$117.75 / bed$
2. Restaurant$65.92 / seat$52.98 / seat$
3. Cocktail Bar$26.38 / seat$21.20 / seat$
4. Hospital$329.76 / bed$264.98 / bed$
5. Laundromat$293.04 / machine$235.53 / machine$
6. Day Care Center$29.31 / child$23.56 / child$
7. Convalescent Care Center$73.26 / bed$58.88 / bed$
VWWRA OR IWWTP Subtotal =$
VWWRA OR IWWTP GRAND TOTAL =$
===== PAGE 25 ===== City of Victorville Development Impact Fees Master Fee Schedule in effect between January 1, 2023, and June 30, 2023 ===== PAGE 26 ===== # CITY OF VICTORVILLE DEVELOPMENT IMPACT FEES MASTER FEE SCHEDULE Adopted 6/7/2022 Residential Development Year 1 - Effective 1/1/2023
Residential DevelopmentUnitParks and RecreationFire ProtectionPolicePublic BuildingsLibrariesRoad ImprovementsSubtotal [1]Admin. Fee (.2% of total)
Single FamilyDwelling Unit$5,045.87$284.20$291.65$1,198.47$252.72$5,213.41$12,286.32$24.57
Multi FamilyDwelling Unit$4,110.40$373.95$206.15$847.13$178.39$3,419.60$9,135.62$18.27
Mobile HomesDwelling Unit$3,957.27$239.32$180.50$741.73$156.09$3,176.54$8,451.45$16.90
[1] Subtotal does not include Water System Capacity fee, Sewer fee and Regional Drainage fee.
Residential DevelopmentWater System Capacity ChargeAdmin. Fee (.2% of total)
3/4" Meter$ 5,686.59$ 11.37
1" Meter$ 9,496.61$ 18.99
1-1/2" Meter$ 18,936.34$ 37.87
2" Meter$ 30,309.52$ 60.62
3" Meter$ 56,865.90$ 113.73
4" Meter$ 94,795.46$ 189.59
6" Meter$ 189,534.04$ 379.07
8" Meter$ 303,265.84$ 606.53
Residential DevelopmentUnitSewerAdmin. Fee\n(.2% of total)
Single FamilyEDU$ 979.25$ 1.96
Multi FamilyEDU$ 979.25$ 1.96
Mobile HomesEDU$ 979.25$ 1.96
Residential DevelopmentUnitRegional DrainageAdmin. Fee\n(.2% of total)
Single FamilyDwelling Unit$ 1,102.44$ 2.20
Multi FamilyDwelling Unit$ 406.87$ 0.81
Mobile HomesDwelling Unit$ 406.87$ 0.81
===== PAGE 27 ===== # CITY OF VICTORVILLE DEVELOPMENT IMPACT FEES MASTER FEE SCHEDULE Adopted 6/7/2022 Non-Residential Effective 1/1/2023
Non-Residential DevelopmentUnitFire ProtectionPolicePublic BuildingsRoad ImprovementsAdmin. Fee (.2% of total)
Retail/Service CommercialKSF486.13104.50429.428,600.0019.24
Professional OfficeKSF665.6283.60343.548,000.0018.19
LodgingRoom246.8046.55191.293,694.518.36
Industrial/Business ParkKSF52.3527.55113.214,000.008.39
High-Cube WarehouseKSF7.4819.0078.08972.242.15
Self-Service StorageKSF22.440.953.901,652.813.36
Gasoline/Service Station [5]Pump628.2312.3550.7547,639.7196.66
InstitutionalKSF67.3122.8093.696,319.5513.01
Public FacilitiesKSF673.1083.60343.549,139.0520.48
Non-Residential DevelopmentUnitSewerAdmin. Fee\n(.2% of total)
Retail/Service CommercialEDU$ 2,867.00$ 5.73
Professional OfficeEDU$ 2,867.00$ 5.73
LodgingEDU$ 2,867.00$ 5.73
Industrial/Business ParkEDU$ 2,867.00$ 5.73
High-Cube WarehouseEDU$ 2,867.00$ 5.73
Self-Service StorageEDU$ 2,867.00$ 5.73
Gasoline/Service Station [5]EDU$ 2,867.00$ 5.73
InstitutionalEDU$ 2,867.00$ 5.73
Public FacilitiesEDU$ 2,867.00$ 5.73
Non-Residential DevelopmentUnitRegional DrainageAdmin. Fee\n(.2% of total)
Retail/Service CommercialAcre$ 22,235.00$ 44.47
Professional OfficeAcre$ 22,235.00$ 44.47
LodgingAcre$ 22,235.00$ 44.47
Industrial/Business ParkAcre$ 22,235.00$ 44.47
High-Cube WarehouseAcre$ 22,235.00$ 44.47
Self-Service StorageAcre$ 22,235.00$ 44.47
Gasoline/Service Station [5]Acre$ 22,235.00$ 44.47
InstitutionalAcre$ 22,235.00$ 44.47
Public FacilitiesAcre$ 22,235.00$ 44.47
Non-Residential DevelopmentWater System Capacity ChargeAdmin. Fee (.2% of total)
3/4" Meter$ 5,686.59$ 11.37
1" Meter$ 9,496.61$ 18.99
1-1/2" Meter$ 18,936.34$ 37.87
2" Meter$ 30,309.52$ 60.62
3" Meter$ 56,865.90$ 113.73
4" Meter$ 94,795.46$ 189.59
6" Meter$ 189,534.04$ 379.07
8" Meter$ 303,265.84$ 606.53
[5] Canopy only; Convenience store, carwash, etc. calculated separately at Retail/Service Commercial rates.