In order to assist you in estimating the permit fees for your project, several tables and charts have been compiled and are included in this package. By following the steps listed below, a reasonable estimate may be made.

STEP 1 – Review page 2 for type of project and determine the value per square foot. Multiply this figure by the total square footage of the project.

STEP 2 – Find the valuation of the project on page 3, and then add the fees for plan review and construction permit.

STEP 3 – Review page 4 for miscellaneous plumbing, electrical, and mechanical fees.

Note that a separate permit is required for each independent structure, even though they may be located on the same parcel.

Additional Permit Fees

Development Impact Fee – $9.28 per square foot for commercial projects, $3.44 per square foot for industrial projects and $1.87 per square foot for industrial high cube projects. This fee is used for roads and public safety capital improvement costs. Following is a break-down of these fees:

Development Impact Fee TypeCommercial Cost per Square FootIndustrial Cost per Square FootIndustrial High Cube Cost per Square Foot
Facilities$1.34$0.44$0.25
Fire$0.17$0.01$0.02
Police$0.17$0.01$0.02
Roads$7.60$2.98$1.58

VWWRA (Victor Valley Water Reclamation Authority) or IWWTP (Industrial Waste Water Treatment Plant) – VWWRA and IWWTP fees are used for the expansion of sewage treatment facilities, and can be computed by completing the form on page 5. The fee assessed is based on the location of the project. Please contact the Development Department for more information.

Sewer Capacity Fees – Commercial projects are figured on an equivalent dwelling unit basis by using the following calculations:

Total number of fixture units (using form on page 5), divided by 20, and multiplied by $350.00.

Other Special Assessments – Depending on the location of the project, there may also be special assessment fees to cover storm drains, bridges, road widening, street lighting, and fire hydrant installation. Please contact the Development Department for more information regarding special assessment districts.

School District Fees – A Certificate of Compliance from the school district must be submitted to the Development Department.

Strong Motion Implementation Program (SMIP) Fee – Projects with a valuation less than $2,381 will receive a SMIP fee of .50. Projects with a valuation greater than $2,381 should multiply the valuation by .00028 to determine SMIP.

Technology Fee – Multiply the Plan Review, Building Permit, Mechanical Permit, Electrical Permit, and Plumbing Permit fees by 4.8% (.048) to determine the Technology Fee.

Green Building Fee – Senate Bill 1473 which provides for the creation of the Building Standards Administration Special Revolving Fund.

Permit ValuationFee
$1 – 25,000$1
$25,001 – 50,000$2
$50,001 – 75,000$3
$75,001 – 100,000$4
Every $25,000 or fraction thereof above $100,000Add $1

THESE FEES ARE FOR ESTIMATION PURPOSES ONLY. ALL PLANS MUST BE SUBMITTED AND APPROVED BEFORE OFFICIAL FEES CAN BE ASSESSED.