Fund No.Facility Fee NamePurpose and Use of the Fee
414 and 415Water System ImprovementsWater Capacity Charges are one-time charges to new development connecting to the City of Victorville/Victorville Water District's water system. System improvements include water distribution pipelines, additional operational and emergency reservoir storage and additional ground water wells. The list of eligible improvement projects for water capacity fee funding is included in Tables 8.1 and 8.4 of the NBS DIF Report. A component of the Water Capacity Charges also includes the cost of acquiring rights to additional ground water or alternative sources of supply. The water rights component of the overall water system capacity charge will be used to acquire additional ground water rights, or to purchase permanent supplemental water if ground water rights are not available. Revenues may also be used for projects and technology that would provide permanent supplemental water to the basin in lieu of ground water rights.
416SewerThe purpose of the sewer capacity charge is to fund the new connections attributable to the impact from new development. Sewer Capacity Charges are one-time charges to new development or existing development first connecting to the City of Victorville's sewer system. The list of eligible planned capital projects funded by sewer capacity charges is shown in the NBS DIF Report, Appendix D, Figure 6.

2.2 Current Fee Schedule

During Fiscal Year 2021-22, the Victorville City Council (Council) adopted Resolutions 22-045 and VWD 22-005, which adopted a Development Impact Fee Study (Nexus Study). On June 7, 2022, Council adopted Resolutions 22-050 and VWD 22-007, which adopted an updated Master Fee Schedule (MFS), and a phased in approach to update fees to the full amounts identified in the Nexus Study.

On December 19, 2023, the Council adopted updated Non-Residential Development Impact Fees via Resolutions 23-100 and VWD 23-015, which went into effect on March 1, 2024. On December 17, 2024, the Council adopted updated Non-Residential Development Impact Fees via Resolutions 24-005 and VWD 24-011, which went into effect on March 1, 2025.

  • Attachment 1 – Residential Development Impact Fee Schedule in effect between July 1, 2024, and December 31, 2024.
  • Attachment 2 – Residential Development Impact Fee Schedule in effect between January 1, 2025, and June 30, 2025.
  • Attachment 3 – Non-Residential Development Impact Fee Schedule in effect between July 1, 2024, and February 28, 2025.
  • Attachment 4 – Non-Residential Development Impact Fee Schedule in effect between March 1, 2025, and June 30, 2025.

City of Victorville Annual Development Impact Fee Report Prepared by NBS

6