CITY OF VICTORVILLE DEVELOPMENT IMPACT FEES MASTER FEE SCHEDULE Adopted 6/7/2022 Residential Development Year 3 - Effective 1/1/2025
Residential DevelopmentUnitParks and RecreationFire ProtectionPolicePublic BuildingsLibrariesRoad ImprovementsSubtotal [3]Admin. Fee (.2% of total)
Single FamilyDwelling Unit$ 5,993.93$ 284.20$ 291.65$ 1,198.47$ 252.72$ 8,595.54$ 16,616.51$ 33.23
Multi FamilyDwelling Unit$ 4,636.96$ 373.95$ 206.15$ 847.13$ 178.39$ 4,769.56$ 11,012.14$ 22.02
Mobile HomesDwelling Unit$ 4,177.57$ 239.32$ 180.50$ 741.73$ 156.09$ 4,040.38$ 9,535.59$ 19.07
[3] Subtotal does not include Water System Capacity fee, Sewer fee and Regional Drainage fee.
Residential DevelopmentWater System Capacity ChargeAdmin. Fee (.2% of total)
3/4" Meter$ 5,686.59$ 11.37
1" Meter$ 9,496.61$ 18.99
1-1/2" Meter$ 18,936.34$ 37.87
2" Meter$ 30,309.52$ 60.62
3" Meter$ 56,865.90$ 113.73
4" Meter$ 94,795.46$ 189.59
6" Meter$ 189,534.04$ 379.07
8" Meter$ 303,265.84$ 606.53
Residential DevelopmentUnitSewerAdmin. Fee (.2% of total)
Single FamilyEDU$ 2,237.75$ 4.48
Multi FamilyEDU$ 2,237.75$ 4.48
Mobile HomesEDU$ 2,237.75$ 4.48
Residential DevelopmentUnitRegional DrainageAdmin. Fee (.2% of total)
Single FamilyDwelling Unit$ 2,014.82$ 4.03
Multi FamilyDwelling Unit$ 988.97$ 1.98
Mobile HomesDwelling Unit$ 988.97$ 1.98