CITY OF VICTORVILLE DEVELOPMENT IMPACT FEES MASTER FEE SCHEDULE
Adopted 6/7/2022 Residential Development Year 2 - Effective 1/1/2024
Residential DevelopmentUnitParks and RecreationFire ProtectionPolicePublic BuildingsLibrariesRoad ImprovementsSubtotal [2]Admin. Fee (.2% of total)
Single FamilyDwelling Unit$ 5,045.87$ 284.20$ 291.65$ 1,198.47$ 252.72$ 7,152.70$ 14,225.61$ 28.45
Multi FamilyDwelling Unit$ 4,373.68$ 373.95$ 206.15$ 847.13$ 178.39$ 4,094.58$ 10,073.88$ 20.15
Mobile HomesDwelling Unit$ 4,067.42$ 239.32$ 180.50$ 741.73$ 156.09$ 3,608.46$ 8,993.52$ 17.99
[2] Subtotal does not include Water System Capacity fee, Sewer fee and Regional Drainage fee.
Residential DevelopmentWater System Capacity ChargeAdmin. Fee (.2% of total)
3/4" Meter$ 5,686.59$ 11.37
1" Meter$ 9,496.61$ 18.99
1-1/2" Meter$ 18,936.34$ 37.87
2" Meter$ 30,309.52$ 60.62
3" Meter$ 56,865.90$ 113.73
4" Meter$ 94,795.46$ 189.59
6" Meter$ 189,534.04$ 379.07
8" Meter$ 303,265.84$ 606.53
Residential DevelopmentUnitSewerAdmin. Fee (.2% of total)
Single FamilyEDU$ 1,608.50$ 3.22
Multi FamilyEDU$ 1,608.50$ 3.22
Mobile HomesEDU$ 1,608.50$ 3.22
Residential DevelopmentUnitRegional DrainageAdmin. Fee (.2% of total)
Single FamilyDwelling Unit$ 1,558.63$ 3.12
Multi FamilyDwelling Unit$ 697.92$ 1.40
Mobile HomesDwelling Unit$ 697.92$ 1.40